Facility snapshot
- Operator as published
- Kentucky Industrial Alliance LLC
- Address and locality
- Cave City · Barren County · Kentucky
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 1,200 MW (source-reported; boundary not independently verified)
- Source freshness
- 13 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000849
What the source record says
Proposed multi-building hyperscale campus (10 buildings x ~200,000 sq ft, ~2M sq ft total) at the Cave City Industrial Park spanning Cave City and unincorporated Barren County. Combined critical capacity reported as 'about 1,200 megawatts.' Jobs figure of 360 is direct jobs at full build-out (300 data-center operations + 60 power generation, per the source, implying an on-site generation component not independently confirmed or itemized this run -- no separate power_generation record created without a source stating its own capacity/technology). An additional ~569 indirect/induced jobs were estimated (total ~929) but only the direct figure is recorded here. Developer/operator name is the plaintiff of record in the zoning lawsuit (Kentucky Industrial Alliance LLC), which the coverage also identifies as the current landowner; no separate development-company name was disclosed in the sources checked. Exact parcel location within the industrial park not confirmed -- coordinates are a Cave City town-center pin.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Kentucky Industrial Alliance says proposed Cave City data center could bring millions in tax revenue · WBKO
- Developer sues Cave City over data center zoning moratorium · WBKO
- Barren data center suits proceed · Bowling Green Daily News
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID kentucky-industrial-alliance-cave-point-cave-city-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.