HostDime Orlando Tier IV Data Center

reported under construction

HostDime

1 Innovative Place · Eatonville · Orange County · Florida · 32751

Capacity not statedSource updated 14 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
HostDime
Address and locality
1 Innovative Place · Eatonville · Orange County · Florida · 32751
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000796

What the source record says

5-acre parcel (of the historic 99-acre Hungerford tract) fronting I-4 at Wymore Rd -- governing municipality is Eatonville, not Maitland; HostDime's own current marketing copy lists a mailing address of "1 Innovative Pl, Maitland, FL 32751" while an aggregator (baxtel) lists "1000 Wymore Rd, Eatonville, FL" for the same building -- both addresses are disputed/unverifiable via parcel search, so no street field is recorded. 100,000 sq ft, 7-story building, 3 data-center floors, >1,000 racks. Groundbreaking May 2021; HostDime's own landing page and data-sheet page disagree on completion quarter (Q3 2026 vs Q2 2026) and the project has slipped repeatedly since an original ~2024 target; as of ClickOrlando's June 2026 report the facility was still not open. Investment is conflicting and stale: GrowthSpotter (Oct 2023) reported an original $35M budget grown to $58M actual (65.7% overrun); a separately-circulating $100M figure is single-sourced and unreconciled, so no investmentUsd is recorded. No disclosed capacityMw. Distinct from HostDime's unrelated, already-operational 25,000 sq ft Tier III facility at 440 W Kennedy Blvd, Orlando. Eatonville Town Council (led by Councilwoman Wanda Randolph) has pushed a transparency measure over electricity/water use, noise, and appearance, and has assessed missed-deadline fines ($250-500/day); this intersects Florida SB 484 (effective July 1, 2026), which expands local authority over large-load customers and data-center water permits. Re-checked 2026-09-10: still under_construction. HostDime has requested multiple deadline extensions from the town of Eatonville (this is the third); September 2026 reporting says the facility could open as early as October 2026 pending final inspection.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID hostdime-eatonville-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.