Licensed lead · not independently verified · dcd-dir-000761

Kenwood Commons Technology Campus

reported proposed

Guild Ventures

Albany · Albany County · New York

Capacity not statedSource updated 9 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Guild Ventures
Address and locality
Albany · Albany County · New York
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000761

What the source record says

Proposed data center inside a mixed-use redevelopment of the 76-acre former Kenwood convent / Doane Stuart School property in Albany. capacityMw IS DELIBERATELY OMITTED, and this is the point of the record: "Guild Ventures... filed an application with the New York Independent System Operator to use 180MW for the project," but the developer told CBS6 the 180 MW is "a theoretical ceiling for the entire mixed-use development" at full buildout and NOT the data center's expected use. Recording 180 as the facility's capacity would therefore be wrong; the smaller data-center-only figure reported elsewhere (up to 100 MW) was not confirmed in a source fetched in this run, so it is not recorded either. The Rockefeller Institute's tracker separately describes it as "a 180 MW data center as part of a mixed-use development" - that reading conflicts with the developer's own clarification, which is why confidence is 'reported'. The developer describes the compute component as a "boutique, edge-scale colocation center" on "approximately 5 acres" of the 76-acre parcel serving hospitals, institutions, nanotech, government services and local employers - hence aiClassification 'mixed_use'. landAcres = 76 is the whole redevelopment parcel, not the data center footprint. Confirmed absences (2026-09-09): no permits had been submitted to the City of Albany as of the fetched reporting, no investment figure is given in the fetched article, and no job counts, utility, or IDA/PILOT agreement is stated. Coordinates geocoded to the named Kenwood / Doane Stuart site in Albany, approximate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID guild-ventures-kenwood-commons-albany-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →