Goodnight Campus

reported under construction

Google / Crusoe

Claude · Armstrong County · Texas

Planned 933 MWSource updated 16 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Google / Crusoe
Address and locality
Claude · Armstrong County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 933 MW (source-reported; boundary not independently verified)
Source freshness
16 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000705

What the source record says

Campus name: Goodnight, near the town of Claude, TX (known address: 10001 Lima Rd, Claude, TX 79019). Coordinates approximate (based on dispatch seed; county parcel area). Developed by Crusoe Energy via entity GN DC1, LLC (Delaware LLC, 255 Filmore St., Denver, CO 80206); Google is the hyperscale tenant/customer, confirmed publicly November 2025. Tax abatement agreement was signed with GN DC1, LLC in late 2024 without publicly naming the tenant. Google confirmed the Crusoe partnership but had not signed an offtake agreement for the on-site gas plant as of early 2026; negotiations on power amounts still ongoing per Google spokesperson. Planned IT capacity: Phase 1 described in tax abatement agreement as 'anticipated to consume up to 530 MW,' 4 buildings each with 4 x 25 MW data halls, on approximately 350 acres; Phase 2 (possible additional 3+ buildings) reported at up to ~500 MW additional; combined full build-out reported as 1 GW+ — all capacity figures are 'up to' ceilings from permit and abatement documents, not firm contracted amounts. Project was scaled back from an original 7-building plan (October 2025 local reporting); 4 buildings with construction permits from TDLR as of early 2026; Crusoe described 3-4 buildings as likely; grading on additional parcels suggests total program may reach 5+ buildings. First phase expected online 2026; initial county PILOT payment expected June/July 2026. The $40B Google Texas investment is a statewide commitment through 2027 covering multiple sites (Armstrong County, Haskell County, Ellis County) with no site-specific investment figure disclosed by Google. A $29B campus investment figure appeared in Aterio/Crusoe reporting — this is a projected ceiling, not a firm committed amount; omitted from investmentUsd per data-rigor policy. Distinct from Google's separate Haskell County TX site and Red Oak (Ellis County) TX sites — do not conflate. Building 3 is scheduled for completion 2026-08-01; Building 4 is due March 2027. Nothing at the campus is yet described as operational.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · reported proposed

    Armstrong County Commissioners Court approved tax abatement agreement with GN DC1, LLC (Crusoe Energy entity) at November 12, 2024 public hearing. Tenant not publicly named at that time.

    Open cited source →

  2. 2025 · reported under construction

    Google confirmed partnership with Crusoe for Goodnight campus as part of $40B statewide Texas announcement, November 2025. Satellite imagery (Cleanview, Feb 24 2026) confirmed two buildings under active construction with roof installation and steel framing underway.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-armstrong-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →