Facility snapshot
- Operator as published
- Google / Crusoe
- Address and locality
- Claude · Armstrong County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 933 MW (source-reported; boundary not independently verified)
- Source freshness
- 16 August 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000705
What the source record says
Campus name: Goodnight, near the town of Claude, TX (known address: 10001 Lima Rd, Claude, TX 79019). Coordinates approximate (based on dispatch seed; county parcel area). Developed by Crusoe Energy via entity GN DC1, LLC (Delaware LLC, 255 Filmore St., Denver, CO 80206); Google is the hyperscale tenant/customer, confirmed publicly November 2025. Tax abatement agreement was signed with GN DC1, LLC in late 2024 without publicly naming the tenant. Google confirmed the Crusoe partnership but had not signed an offtake agreement for the on-site gas plant as of early 2026; negotiations on power amounts still ongoing per Google spokesperson. Planned IT capacity: Phase 1 described in tax abatement agreement as 'anticipated to consume up to 530 MW,' 4 buildings each with 4 x 25 MW data halls, on approximately 350 acres; Phase 2 (possible additional 3+ buildings) reported at up to ~500 MW additional; combined full build-out reported as 1 GW+ — all capacity figures are 'up to' ceilings from permit and abatement documents, not firm contracted amounts. Project was scaled back from an original 7-building plan (October 2025 local reporting); 4 buildings with construction permits from TDLR as of early 2026; Crusoe described 3-4 buildings as likely; grading on additional parcels suggests total program may reach 5+ buildings. First phase expected online 2026; initial county PILOT payment expected June/July 2026. The $40B Google Texas investment is a statewide commitment through 2027 covering multiple sites (Armstrong County, Haskell County, Ellis County) with no site-specific investment figure disclosed by Google. A $29B campus investment figure appeared in Aterio/Crusoe reporting — this is a projected ceiling, not a firm committed amount; omitted from investmentUsd per data-rigor policy. Distinct from Google's separate Haskell County TX site and Red Oak (Ellis County) TX sites — do not conflate. Building 3 is scheduled for completion 2026-08-01; Building 4 is due March 2027. Nothing at the campus is yet described as operational.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024 · reported proposed
Armstrong County Commissioners Court approved tax abatement agreement with GN DC1, LLC (Crusoe Energy entity) at November 12, 2024 public hearing. Tenant not publicly named at that time.
- 2025 · reported under construction
Google confirmed partnership with Crusoe for Goodnight campus as part of $40B statewide Texas announcement, November 2025. Satellite imagery (Cleanview, Feb 24 2026) confirmed two buildings under active construction with roof installation and steel framing underway.
Sources and attribution
- Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027 · Data Center Dynamics
- Google to Use Natural Gas to Power Massive Data Center in Texas · Yale Environment 360
- Google Is Considering Natural Gas Without Carbon Capture in Its AI Data Center Strategy · Distilled
- How a Crusoe-Google campus became Texas' co-location test case · Latitude Media
- Google Launches 1-GW-Plus Co-Located Data Center and Generation Complex in Texas Panhandle · Power Magazine
- Armstrong County AI data center project scaled back from original plan · NewsChannel 10 (Amarillo)
- Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC (Phase 1) · Armstrong County, Texas
- Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power · The Energy Mag
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-armstrong-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.