Licensed lead · not independently verified · dcd-dir-000695

Nobles County Powered Data Park

reported proposed

Geronimo Power (Brookfield Asset Management subsidiary)

Worthington · Nobles County · Minnesota

Planned 400 MWSource updated 24 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Geronimo Power (Brookfield Asset Management subsidiary)
Address and locality
Worthington · Nobles County · Minnesota
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 400 MW (source-reported; boundary not independently verified)
Source freshness
24 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000695

What the source record says

Coordinates are approximate (near Worthington, MN).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID geronimo-nobles-county-powered-data-park-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →