This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Geronimo Power (Brookfield Asset Management subsidiary)
- Address and locality
- Worthington · Nobles County · Minnesota
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 400 MW (source-reported; boundary not independently verified)
- Source freshness
- 24 August 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000695
What the source record says
Coordinates are approximate (near Worthington, MN).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Minnesota's long-predicted data center boom is on shaky ground · Minnesota Reformer
- Nobles County Powered Data Park · Geronimo Power
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Geronimo Power's Farmer-Friendly and Community First Approach Receives Warm Welcome (PR Newswire)
- Geronimo Power seeks feedback on Nobles County data center · Dakota News Now
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID geronimo-nobles-county-powered-data-park-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.