Sioux Falls Technology Park (Gemini Data Center)

reported permitted

Gemini Data Center SD LLC

Sioux Falls · Minnehaha County · South Dakota

Planned 500 MWSource updated 6 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Gemini Data Center SD LLC
Address and locality
Sioux Falls · Minnehaha County · South Dakota
Lifecycle status
reported permitted
Facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified)
Source freshness
6 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000693

What the source record says

aiClassification is 'likely' (not 'confirmed'): Gemini is the land developer, no tenant is signed, and only developer aspiration to attract a hyperscale/AI/neocloud tenant is on record. Capacity (500 MW) and acreage per SiouxFalls.Business; an earlier report cited 160 acres. Coordinates are approximate for the northeast Sioux Falls site. As a developer land project with no signed tenant, its water, subsidy, investment, and job figures remain developer projections only (South Dakota has no state income tax and rejected data-center incentive bills); all recorded as honest-zeros pending a confirmed tenant.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · reported proposed

    Gemini Data Center SD LLC (a California family office under Michael Anvar) acquired ~164 acres from Xcel Energy northeast of Sioux Falls, adjacent to Xcel's Split Rock substation, and sought city approvals for a data center supporting up to 500 MW. Gemini is the land developer, not the operator; no tenant is signed.

    Open cited source →

  2. 2026-01 · reported permitted

    Sioux Falls City Council approved annexation (October 8, 2025) and unanimously approved rezoning from agricultural to light industrial (January 2026), despite hours of opposing testimony. Construction was targeted for 2026 and operation for 2028. The developer committed to funding all utility extensions at its own cost.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID gemini-data-center-sioux-falls-sd. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →