Licensed lead · not independently verified · dcd-dir-000562

Etheridge Lakes Data Center (Great Bridge)

reported cancelled

Emerald Lakes Estates (Doug Fuller)

Chesapeake · Chesapeake (independent city) · Virginia

Capacity not statedSource updated 26 August 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Emerald Lakes Estates (Doug Fuller)
Address and locality
Chesapeake · Chesapeake (independent city) · Virginia
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Not stated
Source freshness
26 August 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000562

What the source record says

22.6-acre parcel on west side of Centerville Turnpike, south of Etheridge Manor Boulevard, Great Bridge area of Chesapeake. Developer Doug Fuller (Emerald Lakes Estates) sought rezoning from agricultural to light industrial; proposed 350,000 sq ft, 35 ft tall, 24/7 staffed facility. City Council denied the rezoning request unanimously. Separately, in July 2026 the Chesapeake Planning Commission recommended a citywide data-center zoning ordinance/policy (conditional use in industrial districts + Fentress Airfield Overlay only) — this is a POLICY change, not a site-specific candidate, and is not included here. No other active Chesapeake DC site rezoning was found this session. Coordinates are approximate (Centerville Turnpike/Great Bridge area); exact parcel not geocoded from GIS this session. Chesapeake City Council denied the rezoning 7-0 on 2025-06-17 (Planning Commission had recommended denial 6-1). Recorded as a cancelled proposal.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-06-17 · reported cancelled

    cancelled per City of Chesapeake Department of Planning, Rezoning Case PLN-REZ-2025-002 (Etheridge Lakes Data Center)

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID emerald-lakes-etheridge-lakes-data-center-chesapeake-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →