Licensed lead · not independently verified · dcd-dir-000524

York 2 Energy Center Data Center

reported proposed

Energy Capital Partners

Peach Bottom Township · York County · Pennsylvania

Capacity not statedSource updated 31 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Energy Capital Partners
Address and locality
Peach Bottom Township · York County · Pennsylvania
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
31 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000524

What the source record says

The 828 MW figure is the existing Calpine generating station's capacity, not the data center's IT load — no compute capacity has been published. The $5 billion is the announced site investment; the separately reported $90 billion figure is a statewide multi-company pledge and is not attributed here.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07-21 · reported proposed

    Announced by Energy Capital Partners at the Pennsylvania Energy and Innovation Summit; no formal land development plan filed with the township as of the August 2026 county survey.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID ecp-york-2-energy-center-data-center-peach-bottom-york-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →