Licensed lead · not independently verified · dcd-dir-000447

Digi Power X Columbiana AI Data Center

reported under construction

Digi Power X

130 Industrial Parkway · Columbiana · Shelby County · Alabama

Planned 40 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Digi Power X
Address and locality
130 Industrial Parkway · Columbiana · Shelby County · Alabama
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 40 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000447

What the source record says

SUBSIDY — AUDITED-STYLE NEGATIVE: the Columbiana City Council "unanimously rejected a tax abatement proposal for Digi Power X", and the article states "The only governmental body that has the jurisdiction to give an abatement on taxes for the Columbiana data center is the City Council." So as of 29 May 2026 this site has NO local tax abatement, and by the reporter's account no other body could have granted one. Digi Power X had requested abatement on "all state and local non-educational property taxes on the project's industrial development property" plus construction-related transaction taxes through 2027. A further abatement proposal may come before the council later. ANCHOR TENANT: 10-year master services agreement with Cerebras Systems for colocation of the 40 MW AI data center, "valued at approximately $1.1 billion with potential for the contract value to reach $2.5 billion, inclusive of renewal terms" — that $1.1B is CONTRACT VALUE, not capital investment, and is deliberately not recorded as investmentUsd; the $371.5M figure is the stated "total investment ... in building, machinery and personal property" from the abatement filing. JOBS: "Digi Power X plans to start out with two jobs at a total annual payroll of $200,000 and to expand to 45 permanent jobs by year three with a total payroll of $4.5 million" — the 2 recorded under jobs.construction is actually the year-one headcount, not a construction workforce; the source states no construction-worker count. SITE HISTORY: property purchased by Digihost Technology Inc from Grede II LLC on 21 June 2022 after the Grede Foundry closed in 2020, and run as a bitcoin-mining operation until the January 2025 conversion announcement. Air emissions to be monitored by ADEM. Coordinates are the OSM industrial-park polygon centroid for Industrial Parkway, not a confirmed parcel footprint.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01 · reported proposed

    Digihost/Digi Power X announced the former Grede Foundry site, in use as a bitcoin-mining operation since 2022, would be converted to a data center.

    Open cited source →

  2. 2026-05 · reported under construction

    "construction on the Columbiana facility is set to begin in May 2026 and be completed by March 2027 for service to begin in April 2027"

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID digi-power-x-columbiana-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →