Licensed lead · not independently verified · dcd-dir-000346

Crow Holdings Stemmons Corridor Data Center Campus

reported proposed

Crow Holdings (developed and leased by CleanArc Data Centers)

Dallas · Dallas County · Texas

Planned 245 MWSource updated 26 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Crow Holdings (developed and leased by CleanArc Data Centers)
Address and locality
Dallas · Dallas County · Texas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 245 MW (source-reported; boundary not independently verified)
Source freshness
26 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000346

What the source record says

Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01-20 · reported proposed

    Crow Holdings announced the 245 MW campus; CleanArc named as development and leasing lead in February 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID crow-holdings-cleanarc-stemmons-dallas-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →