Licensed lead · not independently verified · dcd-dir-000238

Cielo Haines City Data Center

reported proposed

Cielo Digital Infrastructure

Marion Road at State Road 544-East · Haines City · Polk County · Florida

Planned 300 MWSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Cielo Digital Infrastructure
Address and locality
Marion Road at State Road 544-East · Haines City · Polk County · Florida
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000238

What the source record says

300 MW planned, ~74-acre site along Marion Road and State Road 544 East, Haines City, Polk County -- pre-application stage (no site plan, zoning request, or development agreement filed as of Aug 2026), distinct from the already-tracked Lakeland (Ryan Companies/Project Swan) and Fort Meade (Stonebridge/Florida Ecopark) Polk County sites. No precise parcel address, investment figure, or jobs figure disclosed in any source found; coordinates are the Haines City area centroid, not the actual site. The Data Center Dynamics original report (sources[2]) returned a 403 on direct re-fetch this session -- corroborated via Yahoo Finance syndication and independent Citrus Tea investigative reporting citing city commission records; multiple other independent local outlets (WFLA, Fox 13 Tampa Bay, Bay News 9) covered the same story at headline level.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · reported proposed

    Cielo Digital Infrastructure held an initial meeting with Haines City on Nov 4, 2025; the Deputy City Manager signed a non-binding concurrence letter on Nov 17, 2025 -- roughly seven months before the project became public.

    Open cited source →

  2. 2026-07 · reported proposed

    Project publicly disclosed via local news coverage of city commission records. No formal site plan, zoning request, or development agreement filed. Blocked pending Southwest Florida Water Management District (SWFWMD) approval of a Water Use Permit modification; city officials say full approval is unlikely before end of 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cielo-haines-city-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.