Chestnut River Holyoke Data Center (former Hampden Papers complex)

reported proposed

Chestnut River Power and Infrastructure

100 Water Street · Holyoke · Hampden County · Massachusetts · 01040

Planned 20 MWSource updated 15 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Chestnut River Power and Infrastructure
Address and locality
100 Water Street · Holyoke · Hampden County · Massachusetts · 01040
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 20 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000234

What the source record says

Status is "proposed", not "cancelled": Holyoke's City Council voted 9-4 on 2026-06-17 to ban AI data centers above 12 MW, which would bar this 20 MW project as designed, but the developer stated "We're not closing the door - and we hope Holyoke won't either" and had neither filed permits nor bought the property. The coordinate is the OSM-mapped former Hampden Paper Co building at the cited address, marked approximate because the proposal covers the wider complex. The 20 MW is the developer's stated figure; $200M is the reported project cost for this site only. Holyoke's ban explicitly exempts the tracked MGHPCC.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-16 · reported proposed

    Boston-based Chestnut River Power and Infrastructure publicly sought the former Hampden Papers complex at 100 Water Street for a 20-megawatt "micro facility"; WAMC reports no permits filed and no property purchased at that point.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID chestnut-river-holyoke-ma. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →