Licensed lead · not independently verified · dcd-dir-000233

Cerebras Oklahoma City Data Center

source-reported operational

Cerebras Systems

Oklahoma City · Oklahoma County · Oklahoma

Operational 10 MWSource updated 7 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Cerebras Oklahoma City Data Center.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Cerebras Systems
Address and locality
Oklahoma City · Oklahoma County · Oklahoma
Official metro area
Oklahoma City, OK
Source-reported status
operational
Facility type
data center
Reported capacity
Operational: 10 MW (source-reported; boundary not independently verified)
Source freshness
7 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000233

What the source record says

Colocation tenancy: Cerebras Systems is the AI infrastructure operator; Scale Datacenters is the facility host/colo provider (acquired the 82,000 sq ft building from Expand Energy, formerly Chesapeake Energy, originally built ~2013). Facility address: 512 NW 62nd St (corner of NW 61st/62nd St and N Lee Ave), Oklahoma City. Ribbon cutting September 22, 2025. Houses 300+ CS-3 Wafer Scale Engine systems delivering 44+ exaflops of AI compute. Facility features Tier III-quality infrastructure, tornado and seismic shielding, triple-redundant power stations. Cerebras matches all kWh consumption with renewable energy (REC-based, not on-site generation). OG&E reported as grid utility — consistent with OKC service territory but not explicitly named in Cerebras primary sources. Investment amount not disclosed. Jobs: Cerebras blog references 'hundreds of good-paying jobs' in engineering, IT, and operations plus local college workforce partnerships — no firm headcount confirmed. Coordinates are approximate (dispatch seed); actual facility is at 512 NW 62nd St.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported proposed

    Cerebras announced six new AI datacenters including OKC; Scale Datacenters selected as host colo; 300+ CS-3 systems expected online by June 2025

    Open cited source →

  2. 2025-09 · source-reported operational

    Ribbon cutting September 22, 2025; 10 MW facility with 300+ CS-3 wafer-scale systems confirmed online

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cerebras-oklahoma-city-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →