Project Atlas Data Center Campus (South Whitehall Township)

reported proposed

CDE Acquisitions, LLC

2747 North Cedar Crest Boulevard · South Whitehall Township · Lehigh County · Pennsylvania · 18104

Capacity not statedSource updated 12 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
CDE Acquisitions, LLC
Address and locality
2747 North Cedar Crest Boulevard · South Whitehall Township · Lehigh County · Pennsylvania · 18104
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
12 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000217

What the source record says

Three parcels at 2493, 2807 and 2747 N. Cedar Crest Boulevard totalling 410 acres across from Parkland High School, owned by Jeras Corporation, with CDE Acquisitions, LLC of Atlanta as applicant. The revised program is three data center buildings of 492,285 sq ft each plus a 40,680 sq ft administration building and a 39,167 sq ft warehouse, 1,556,702 sq ft in total - down from six buildings over 5 million sq ft. Parking drops from 966 to 399 spaces and weekday trips from 3,865 to 1,154. Includes an on-site electrical substation, emergency generators and a private septic field, with a water main extension requested along Ritter Road. Three barns are to be restored and dedicated to the township; a brick house and farmstead would be removed. Stated construction start November 2029, completion April 2030.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-11 · reported proposed

    Revised plan scheduled for a South Whitehall Township public hearing on June 11, 2026, after the developer cut the program from six buildings to three data center buildings plus support structures.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cde-acquisitions-project-atlas-south-whitehall-lehigh-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →