Licensed lead · not independently verified · dcd-dir-000209

Red Butte Energy and Data Center Campus

reported proposed

BrightNight

Newcastle · Iron County · Utah

Planned 1,500 MWSource updated 1 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
BrightNight
Address and locality
Newcastle · Iron County · Utah
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified)
Source freshness
1 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000209

What the source record says

Approximately 8 miles north of Newcastle, roughly 20 miles from Cedar City; application on hold pending the county's data-center moratorium. Subsidies checked (2026-09-08): structural zero — the project is proposed and on hold under Iron County's moratorium, and no Iron County or Newcastle CRA/RDA was found to execute a pre-approval participation agreement; Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-05-22 · reported proposed

    Application submitted May 4, 2026 and deemed incomplete May 22, 2026; on hold under Iron County's 180-day data center moratorium.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID brightnight-red-butte-newcastle-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →