This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)
- Address and locality
- Hood County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Operational: 17 MW; Planned: 311 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000187
What the source record says
Repurposing a power-ready ~50-acre industrial site (30,000+ sq ft of existing structures, 17 MW operational grid power, on-site gas pipelines) into an AI/HPC datacenter campus; acquisition completed 2026-07-20. AI datacenter build-out itself has not yet begun.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-20 · reported proposed
Site acquisition completed via 50/50 JV.
Sources and attribution
- Big Digital Energy and 10NetZero Complete Acquisition of Hood County, Texas Site · GlobeNewswire
- Big Digital Energy SEC exhibit re: Hood County / DFW-area site LOI · SEC EDGAR
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID big-digital-energy-10netzero-hood-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.