Licensed lead · not independently verified · dcd-dir-000105

Project Springbank (Atlas Development Bartow County Campus)

reported proposed

Atlas Development LLC

Barnsley Gardens Road at Horseshoe Loop · Adairsville · Bartow County · Georgia

Planned 432 MWSource updated 10 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Atlas Development LLC
Address and locality
Barnsley Gardens Road at Horseshoe Loop · Adairsville · Bartow County · Georgia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 432 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000105

What the source record says

Six buildings of about 379,000 sq ft each (2.27M sq ft total), each drawing up to 78 MW for a 432 MW campus total. Anticipated completion December 2031. No named end-user operator is attached to the project. Public-reception check (2026-09-10): Checked the original Northwest Georgia News piece (2026-09-10); it covers the Development of Regional Impact filing and a site plan from Bartow County's community development director, plus a competitor CEO's skepticism about demand forecasts being overstated -- not local resident opposition or support. No public hearing, resident reaction, or elected-official statement about this specific project was found in this source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-02 · reported proposed

    Preliminary plans disclosed in a Development of Regional Impact filing; rezoning from A-1 to I-1 still required.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID atlas-project-springbank-adairsville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →