This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Atlas Development LLC
- Address and locality
- Barnsley Gardens Road at Horseshoe Loop · Adairsville · Bartow County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 432 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000105
What the source record says
Six buildings of about 379,000 sq ft each (2.27M sq ft total), each drawing up to 78 MW for a 432 MW campus total. Anticipated completion December 2031. No named end-user operator is attached to the project. Public-reception check (2026-09-10): Checked the original Northwest Georgia News piece (2026-09-10); it covers the Development of Regional Impact filing and a site plan from Bartow County's community development director, plus a competitor CEO's skepticism about demand forecasts being overstated -- not local resident opposition or support. No public hearing, resident reaction, or elected-official statement about this specific project was found in this source.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-02 · reported proposed
Preliminary plans disclosed in a Development of Regional Impact filing; rezoning from A-1 to I-1 still required.
Sources and attribution
- New data center proposal in Bartow would require as much power as 324K homes · Rome News-Tribune / Northwest Georgia News
- Data Center Operator Planning $4.5B Bartow County Campus · Connect CRE
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID atlas-project-springbank-adairsville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.