Ardent Data Centers Pittsburgh (McKees Rocks)

reported operational

Ardent Data Centers (Northern Data Group)

McKees Rocks · Allegheny County · Pennsylvania

Planned 20 MWOperational 5 MWSource updated 17 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Ardent Data Centers (Northern Data Group)
Address and locality
McKees Rocks · Allegheny County · Pennsylvania
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 5 MW; Planned: 20 MW (source-reported; boundary not independently verified)
Source freshness
17 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000090

What the source record says

41,000 sq ft building on 7.5 acres in McKees Rocks, Allegheny County, acquired by Ardent (Northern Data Group) in January 2024 with 5 MW in place and a phased path to 20 MW. Purpose-built for GPU/HPC workloads at 135 kW+ rack densities. Street address is reported by third-party directories as 615 McMichael Road but was not confirmed in the sources cited here, so it is omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01-22 · reported operational

    Acquisition of the existing Pennsylvania data center completed; conversion to a high-density HPC facility expected complete Q4 2024, scaling to 20 MW.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID ardent-pittsburgh-mckees-rocks-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →