This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Aphorio Carter
- Address and locality
- Collierville · Shelby County · Tennessee
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000076
What the source record says
capacityMw checked 2026-09-09 and left unset: the only power figure published for this site is 10 MW of generator backup, which is standby capacity, not critical IT load, and directory listings that print "10 MW" are restating that same backup figure. The building is 100% net leased to a single tenant, so no operator capacity sheet exists.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Aphorio Carter Acquires Data Center in Collierville, TN · Aphorio Carter (via PR Newswire)
- Memphis Data Centers & Colocation · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aphorio-carter-collierville-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.