This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Amazon Data Services, Inc.
- Address and locality
- 6000 TX-18 · Pecos County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 25 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000065
What the source record says
Three buildings (A, B, C), 189,060 sq ft / $300M each ($900M total this phase), at 6000 TX-18, ~11 miles north of Fort Stockton; construction planned Aug-Dec 2026. To be powered initially off-grid by the adjacent Pacifico Energy 'GW Ranch' gas plant (already tracked as gw-ranch-pacifico-energy-pecos-county-tx) with a path to future grid interconnection; distinct facility/operator from that power_generation record and from Microsoft's and Core Scientific's separate Pecos County campuses.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Amazon Files Plans for New Data Center Buildings in Texas · US Data Center Projects
- Amazon's planned data center campus in Pecos County, Texas: Read Amazon's statement · About Amazon
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID amazon-pecos-county-data-center-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.