Alterra Marshall Technology & Energy Center

reported proposed

Alterra Development

Marshall · Calhoun County · Michigan

Planned 1,400 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Alterra Development
Address and locality
Marshall · Calhoun County · Michigan
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,400 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000058

What the source record says

Proposed data center (Marshall Technology & Energy Center, MTEC) plus a co-located natural-gas electric generation facility within Brooks Industrial Park, Marshall. WWMT (2026-04) resolves the load split that earlier reporting left open: up to 1,400 MW required at full buildout, around 1,000 MW of that from on-site gas turbines and up to 400 MW imported from the grid at peak — so capacityMw.planned is the campus power requirement and the 1 GW plant is carried both in energy.onSiteGenerationMw and as its own power_generation record. ~270 acres (112 buildable), roughly half wetlands. Alterra (Toronto-based) estimates 300-500 direct high-skill jobs. Mayor Wolfersberger (2026-01) called it "just a concept" with "no site plans or utility agreements yet"; due diligence runs into Q3 2026, then construction is "probably 18 months to two years away" if approved. Land is already zoned heavy industrial, so no public referendum is required (unlike Augusta Township). Planned closed-loop liquid cooling. Coordinates are an approximate Marshall-area estimate, not parcel-geocoded; the LDFA purchase price ($1.12M) is for land only, not a project investment figure. capacityMw and jobs deliberately left unfilled rather than normalized: the source gives a ceiling ('up to 1,400 megawatts') and a range ('300 to 500 skilled jobs') that does not distinguish construction from permanent. The $1.12M is the land purchase price, not project investment. Figures recorded here for a maintainer to promote if the hedged forms are acceptable.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID alterra-development-marshall-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.