  "schema_version": "0.5",
  "source": "Projection of canonical data/claims.json.",
  "record_count": 50,
  "claims": [
    {
      "id": "indiana-count-60",
      "record_id": null,
      "topic": "Statewide count",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating CAC's queue of roughly 60 proposed hyperscale projects as 60 operating physical buildings.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Statewide count",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Citizens Action Coalition says approximately 60 large hyperscale data centers were proposed over two years and that only several are operating. Its public index is a useful proposal-discovery queue, including 18 entries it labels withdrawn—not a verified count of operating physical buildings. DataCenterData cites the queue but does not adopt it as a statewide facility total.",
      "unknown": "Independently reconstructed statewide operating-facility count.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Institution; Institution"
      },
      "sources": [
        {
          "title": "Citizens Action Coalition Indiana data-center map",
          "publisher": "Citizens Action Coalition",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-10",
          "url": "https://www.citact.org/ai-data-centers",
          "locator": "https://www.citact.org/ai-data-centers",
          "supports": "CAC presents a proposal-discovery queue of roughly 60 hyperscale entries, including withdrawn labels; not a verified operating-building census."
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/indiana-count-60/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData Indiana coverage boundary",
          "url": "/indiana/#coverage"
        }
      ]
    },
    {
      "id": "aws-campus-complete",
      "record_id": "aws-new-carlisle",
      "topic": "Project status",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Treating AWS Project Rainier's operation as proof that the full New Carlisle campus is complete.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Project status",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Amazon says its multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site. That supports an operating milestone, not completion of every planned New Carlisle building or the full announced investment scope.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Amazon Project Rainier operating update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
          "locator": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-campus-complete/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData AWS New Carlisle ledger",
          "url": "/projects/aws-new-carlisle/"
        }
      ]
    },
    {
      "id": "meta-lebanon-current-gw",
      "record_id": "meta-lebanon",
      "topic": "Power / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Reading Meta Lebanon's 1 GW design as current measured grid demand.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Meta describes a 1 GW campus and reported a February 2026 groundbreaking. The reviewed sources do not establish current metered load, a completed buildout or a comparable utility-service commitment.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Meta Lebanon groundbreaking announcement",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-current-gw/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData Meta Lebanon ledger",
          "url": "/projects/meta-lebanon/"
        }
      ]
    },
    {
      "id": "meta-closed-loop-zero-water",
      "record_id": "meta-lebanon",
      "topic": "Water / cooling",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Closed-loop liquid cooling means the Meta Lebanon campus will use no water.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Water / cooling",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Meta says the design will recirculate cooling water and use zero water for a majority of the year. That is narrower than zero annual or total campus water use and remains a future design claim until operating measurements exist.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Company; Institution"
      },
      "sources": [
        {
          "title": "Meta Lebanon cooling description",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-closed-loop-zero-water/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData cooling and water definitions",
          "url": "/water/"
        }
      ]
    },
    {
      "id": "hammond-facility-closed",
      "record_id": "digital-crossroads-hammond",
      "topic": "Entity / lifecycle",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "The expiration of Hammond's CoreWeave agreement means the existing Digital Crossroad data center closed.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Entity / lifecycle",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Hammond says the separate agreement for the proposed 301 Digital Crossroads expansion expired. City records identify CoreWeave as an existing tenant at the operating 100 Digital Crossroads facility. The failed expansion and existing DX-1 site are not the same lifecycle event.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Gov. record"
      },
      "sources": [
        {
          "title": "City of Hammond agreement-expiration notice",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "locator": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "supports": ""
        },
        {
          "title": "Hammond Common Council minutes",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "digital-crossroads-hammond",
        "coreweave-hammond",
        "digital-crossroad-dx1"
      ],
      "href": "/claims/hammond-facility-closed/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "microsoft-laporte-jobs-now",
      "record_id": "microsoft-la-porte",
      "topic": "Jobs / timing",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Microsoft La Porte already has more than 600 permanent Microsoft jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / timing",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Microsoft's June 2026 update describes more than 600 permanent jobs in the first phase, while Indiana's 2024 announcement said up to 200 jobs by the end of 2032. Groundbreaking is supported; observed project employment and the changed scopes are not yet reconciled.",
      "unknown": "Observed employment; whether the 200-by-2032 and 600+ first-phase figures describe the same scope.",
      "counterevidence": [],
      "verdict": "Not yet due",
      "confidence": {
        "level": "medium",
        "basis": "Company; Gov. record"
      },
      "sources": [
        {
          "title": "Microsoft La Porte groundbreaking update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
          "locator": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
          "supports": ""
        },
        {
          "title": "Indiana's 2024 Microsoft announcement",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "First-phase completion notice or a payroll record",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "microsoft-la-porte"
      ],
      "href": "/claims/microsoft-laporte-jobs-now/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "meta-jeffersonville-job-unit",
      "record_id": "meta-jeffersonville",
      "topic": "Jobs / unit",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "Meta Jeffersonville's hundreds of construction jobs are hundreds of permanent operating jobs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / unit",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "Indiana's project announcement separates approximately 100 operational jobs from hundreds of construction jobs. Neither category is treated as observed until employment evidence and the relevant due date are established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indiana Meta Jeffersonville announcement",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/01/25/gov.-holcomb-announces-meta-to-build-an-800m-data-center-campus-in-indiana",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-jeffersonville"
      ],
      "href": "/claims/meta-jeffersonville-job-unit/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    },
    {
      "id": "sabey-cost-allocation-generalized",
      "record_id": "sabey-indianapolis",
      "topic": "Power / cost allocation",
      "state": "IN",
      "kind": "tested-reading",
      "claim": "One Indianapolis developer cost commitment proves no Indiana data center can affect other customers' electricity costs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / cost allocation",
        "scope": "Indiana",
        "period": "None recorded"
      },
      "supports": "The reviewed Indianapolis filing says Sabey will pay costs related to the project's substation, generation, transmission and distribution needs. That is meaningful site-specific evidence; it does not establish every tariff, wholesale-market effect or project in Indiana.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Indianapolis petitioner appendix, cases 2025-CAP-856 / 2025-CVR-856",
          "publisher": "",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-10",
          "url": "https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf",
          "locator": "https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5368/2025-cap-856_2025-cvr-856_petitioner_appendix_mdc_3-18-26_final.pdf",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "sabey-indianapolis"
      ],
      "href": "/claims/sabey-cost-allocation-generalized/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData Indiana project index",
          "url": "/indiana/#projects"
        }
      ]
    },
    {
      "id": "ohio-count-200",
      "record_id": null,
      "topic": "Statewide count",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Ohio has more than 200 data centers.",
      "claimant": {
        "name": "Ohio Consumers' Counsel",
        "role": "advocate",
        "said_on": null,
        "said_where": {
          "title": "Ohio Consumers' Counsel quick facts",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "section 'Data Centers in Ohio'"
        }
      },
      "unit_scope": {
        "unit": "Statewide count",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio's consumer advocate repeats a commercial directory count. It is useful as a market signal, but the underlying unit can include buildings, suites and campuses and is not a state census. The advocate's own wording also varies: its web fact sheet says more than 200, while its March 2026 PDF fact sheet says about 200. DataCenterData does not adopt 200+ as its own count.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution; Gov. record"
      },
      "sources": [
        {
          "title": "Ohio Consumers' Counsel quick facts",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "supports": "OCC web fact sheet repeats a commercial-directory count of more than 200."
        },
        {
          "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
          "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'",
          "supports": "OCC March 2026 PDF uses 'about 200', not 'more than 200'."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "Ohio's consumer advocate repeats a commercial directory count. It is useful as a market signal, but the underlying unit can include buildings, suites and campuses and is not a state census. DataCenterData does not adopt 200+ as its own count.",
          "to": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
          "reason": "Added the wording difference between OCC's web fact sheet and its PDF fact sheet. Verdict unchanged.",
          "evidence_url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "by": "internal review",
          "evidence": [
            {
              "title": "Quick Facts: Data Centers in Ohio (web page)",
              "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
              "locator": "'Ohio has more than 200 data centers, making it the fifth-highest state in the country.'"
            },
            {
              "title": "Data Centers in Ohio (OCC fact sheet PDF, March 2026)",
              "url": "https://occ.ohio.gov/sites/default/files/2026-03/OCC-Data-Centers-in-Ohio.pdf",
              "locator": "'Ohio has about 200 data centers, making it the fifth highest state in the country.'"
            }
          ]
        }
      ],
      "entity_ids": [],
      "href": "/claims/ohio-count-200/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData Ohio coverage definition",
          "url": "/ohio/#coverage"
        }
      ]
    },
    {
      "id": "aep-ratepayer-protection",
      "record_id": null,
      "topic": "Power / rates",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Ohio's 85% data-center tariff as proof that residents cannot be affected by data-center-driven power costs.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power / rates",
        "scope": "Ohio",
        "period": "tariff effective 2025-07-23; AEP load update 2026-02-13"
      },
      "supports": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. That is real protection against stranded distribution investment; it is not proof that generation, transmission or wholesale-market costs can never affect household bills. The 85% figure is also narrower than it sounds: under AEP's published formula the contract-capacity minimum is about 72.5% at 50 MW and 82.5% at 100 MW, and 85% of contract capacity is a cap reached only near 117 MW (a separate ratchet uses 85% of the highest billing demand in the prior 11 months). AEP also reports that 12,219 of its 17,861 MW of contracted data-center load was signed before the tariff took effect.",
      "unknown": "Whether generation, transmission, wholesale-market or pre-tariff contracts can affect household bills remains a separate question from this distribution-tariff arithmetic.",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution; Institution"
      },
      "sources": [
        {
          "title": "Ohio Consumers' Counsel quick facts",
          "publisher": "Ohio Consumers' Counsel",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "locator": "https://occ.ohio.gov/factsheet/quick-facts-data-centers-ohio",
          "supports": "OCC describes the 85% contracted-capacity payment term; it does not prove household bills cannot be affected."
        },
        {
          "title": "AEP Ohio Schedule DCT terms",
          "publisher": "AEP Ohio",
          "class": "Institution",
          "published": "2025-07-23",
          "retrieved": "2026-09-12",
          "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "locator": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "supports": "Published Schedule DCT minimum-demand formula. Arithmetic below is DataCenterData's, not an AEP quotation."
        },
        {
          "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
          "publisher": "AEP Ohio",
          "class": "Institution",
          "published": "2026-02-13",
          "retrieved": "2026-09-12",
          "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
          "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'",
          "supports": "AEP reports contracted quantities, not current consumption."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "The PUCO-approved AEP Ohio tariff allocates substantial underuse and cancellation risk to new loads over 25 MW. That is real protection against stranded distribution investment; it is not proof that generation, transmission or wholesale-market costs can never affect household bills.",
          "to": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
          "reason": "Added how the 85% minimum-demand term works by contract size and AEP's count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP's published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).",
          "evidence_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
          "by": "internal review",
          "evidence": [
            {
              "title": "AEP Ohio Data Center Tariff (minimum demand charges)",
              "url": "https://www.aepohio.com/company/about/rates/data-center-tariff/",
              "locator": "minimum demand formula: 'the minimum demand cannot exceed 85% of the total contract capacity'"
            },
            {
              "title": "AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working (2026-02-13)",
              "url": "https://www.aepohio.com/company/news/view?releaseID=10753",
              "locator": "'in addition to 12,219 MW of data center contracts signed before the tariff went into effect'; 'AEP Ohio now has 17,861 MW of contracted data center projects'"
            }
          ]
        }
      ],
      "entity_ids": [],
      "href": "/claims/aep-ratepayer-protection/",
      "derivation": "AEP published formula: 15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity.",
      "computed_by": "DataCenterData",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "new-albany-payroll-equivalent",
      "record_id": null,
      "topic": "Taxes / jobs",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading New Albany's $178 million payroll-equivalent figure as actual operator payroll.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Taxes / jobs",
        "scope": "Ohio",
        "period": "tax year 2024"
      },
      "supports": "The city calls $178 million a payroll equivalent: the amount of payroll that would yield the same revenue at its 2% income-tax rate. It is not the operator's payroll or an employee count.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "New Albany city-finance page",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://datacenters.newalbanyohio.org/city-finances/",
          "locator": "https://datacenters.newalbanyohio.org/city-finances/",
          "supports": "City-reported payroll-equivalent tax-base figure at a 2% income-tax rate, not operator payroll or headcount."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/new-albany-payroll-equivalent/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData New Albany ledger",
          "url": "/projects/new-albany/"
        }
      ]
    },
    {
      "id": "ohio-data-centers-no-taxes",
      "record_id": null,
      "topic": "Taxes / incentives",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading Ohio's equipment sales-and-use-tax exemption as meaning a qualifying project pays no taxes.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Taxes / incentives",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio Revised Code §122.175 still supplies the eligibility framework: at least $100 million in project investment and at least $1.5 million in annual qualifying payroll, with agreement and annual verification requirements. It authorizes a complete or partial sales-and-use-tax exemption for qualifying data-center equipment. It does not by itself mean a qualifying project pays no taxes, and it does not repeal existing agreements. Whether new exemption requests remain paused is a separate claim (ohio-exemption-pause).",
      "unknown": "Net fiscal result of any named project; whether a named project complied with or received an exemption.",
      "counterevidence": [],
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Ohio data-center tax-exemption statute",
          "publisher": "Ohio Legislative Service Commission / Ohio Revised Code",
          "class": "Gov. record",
          "published": "2025-09-30",
          "retrieved": "2026-09-12",
          "url": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "locator": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "supports": "The statute authorizes a complete or partial equipment sales-and-use-tax exemption for qualifying projects. It does not erase payroll withholding, all real-property taxes, local charges or negotiated payments, and it does not repeal existing agreements."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/ohio-data-centers-no-taxes/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "meta-nuclear-direct",
      "record_id": "meta-new-albany-oh",
      "topic": "Power source",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Reading Meta's nuclear agreements as dedicated plants directly wired to the New Albany campus.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Power source",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Meta says the agreements will deliver power to regional grids supporting its operations. New Albany says the campus draws from the regional grid. That is different from a dedicated wire or plant serving only the data center.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Company; Gov. record"
      },
      "sources": [
        {
          "title": "Meta nuclear-energy announcement",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-01",
          "retrieved": "2026-09-12",
          "url": "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/",
          "locator": "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/",
          "supports": "Meta announced nuclear-energy projects as company plans, not a proven direct supply relationship for a named Ohio campus."
        },
        {
          "title": "City of New Albany statement",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "2026-01",
          "retrieved": "2026-09-12",
          "url": "https://newalbanyohio.org/news/2026/01/statement-regarding-metas-nuclear-energy-projects/",
          "locator": "https://newalbanyohio.org/news/2026/01/statement-regarding-metas-nuclear-energy-projects/",
          "supports": "Municipal statement about Meta's announcement; not independent proof of a completed nuclear-to-campus power contract."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-new-albany-oh"
      ],
      "href": "/claims/meta-nuclear-direct/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "microsoft-jobs-now",
      "record_id": "microsoft-new-albany-oh",
      "topic": "Jobs / timing",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Microsoft's roughly 50 operating employees per facility as current observed employment across three sites.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Jobs / timing",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Microsoft projects about 50 employees per facility once operational and says three facilities are to be operational by the end of 2029. Current construction activity and modeled jobs are not observed permanent operating headcount.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Not yet due",
      "confidence": {
        "level": "medium",
        "basis": "Company; Company"
      },
      "sources": [
        {
          "title": "Microsoft Licking County impact brief",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://local.microsoft.com/wp-content/uploads/2026/06/Economic-Impact_LickingCountyOH_FY26Q4.pdf",
          "locator": "https://local.microsoft.com/wp-content/uploads/2026/06/Economic-Impact_LickingCountyOH_FY26Q4.pdf",
          "supports": ""
        },
        {
          "title": "Microsoft Heath construction update",
          "publisher": "",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "locator": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "microsoft-new-albany-oh",
        "microsoft-heath-oh",
        "microsoft-hebron-oh"
      ],
      "href": "/claims/microsoft-jobs-now/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "ohio-water-permit",
      "record_id": null,
      "topic": "Water / permits",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating Ohio EPA's draft general permit as final blanket permission or proof of actual discharge.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Water / permits",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Ohio EPA did not finalize draft permit OHD000001. On July 21, 2026, the agency said it would continue with individual NPDES permits instead. The abandoned draft was never blanket permission, and an individual permit is still permission—not proof of actual discharge or site compliance.",
      "unknown": "The direct 21 July Ohio EPA release was not retrieved. An individual NPDES permit is permission, not measured discharge or proof of compliance.",
      "counterevidence": [],
      "verdict": "Contradicted",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "Ohio EPA draft OHD000001",
          "publisher": "Ohio EPA",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/Data_Centers/OHD000001_Draft.pdf",
          "locator": "https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/Data_Centers/OHD000001_Draft.pdf",
          "supports": "Draft OHD000001 was never blanket permission."
        },
        {
          "title": "Ohio EPA notice republished by The Clermont Sun (July 21, 2026)",
          "publisher": "The Clermont Sun (republication of Ohio EPA notice)",
          "class": "Institution",
          "published": "2026-07-22",
          "retrieved": "2026-09-11",
          "url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "locator": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "supports": "Newspaper republication of the agency notice. This is not the agency record itself."
        },
        {
          "title": "Rep. Rader Applauds Ohio EPA Decision to Require Individual Wastewater Permits for Data Centers",
          "publisher": "Ohio House of Representatives",
          "class": "Gov. record",
          "published": "2026-07-21",
          "retrieved": "2026-09-12",
          "url": "https://ohiohouse.gov/members/tristan-rader/news/rep-rader-applauds-ohio-epa-decision-to-require-individual-wastewater-permits-for-data-centers-147223",
          "locator": "press release: Ohio EPA would not finalize a proposed statewide general wastewater discharge permit and would continue with individual NPDES permits",
          "supports": "Ohio House government page independently corroborates the agency decision. Direct 21 July Ohio EPA release was not retrieved."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "Draft Ohio data-center general NPDES permit treated as if it were a final, measured water authorization.",
          "to": "Ohio EPA said on July 21, 2026 that it would not finalize draft OHD000001 and would continue with individual NPDES permits. A permit is not measured discharge.",
          "reason": "Correction chronology uses the recorded date, not the 21 July agency-event date.",
          "evidence_url": "https://www.clermontsun.com/2026/07/22/ohio-epa-will-not-finalize-proposed-data-center-general-permit",
          "by": "internal review"
        }
      ],
      "entity_ids": [],
      "href": "/claims/ohio-water-permit/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "new-albany-water-capacity",
      "record_id": null,
      "topic": "Water / capacity",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Treating New Albany's no-additional-capacity statement as proof that facility-level water impact is negligible.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Water / capacity",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "The city says it has not needed additional water capacity because of data centers. That city page still does not provide facility-level withdrawals. Google later published company-reported 2025 campus figures for New Albany, Lancaster and Lockbourne; those remain company claims with third-party limited assurance, not municipal meter audits. Independent utility/meter records, cooling share and peak-day demand remain missing for other operators.",
      "unknown": "Independent utility/meter records; cooling-only share; peak-day demand; operators other than Google's company-reported 2025 campus rows.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Gov. record; Institution"
      },
      "sources": [
        {
          "title": "City of New Albany data-center information",
          "publisher": "City of New Albany",
          "class": "Gov. record",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://datacenters.newalbanyohio.org/",
          "locator": "https://datacenters.newalbanyohio.org/",
          "supports": "City says it has not needed additional water capacity because of data centers. That is not facility-level metered withdrawal, consumption, discharge or peak-day demand."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [],
      "href": "/claims/new-albany-water-capacity/",
      "migration_status": "pending_independent_review",
      "related_pages": [
        {
          "title": "DataCenterData water field definitions",
          "url": "/water/"
        }
      ]
    },
    {
      "id": "millersport-rate-impact",
      "record_id": "vantage-oh2-millersport",
      "topic": "Power / developer claim",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "The natural-gas power facility described as adjacent to Vantage's planned Millersport campus means the campus will not affect electricity costs for local residents or businesses.",
      "claimant": {
        "name": "Vantage",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Vantage Millersport campus FAQ",
          "url": "https://vantagemillersportcampus.com/faq/",
          "locator": "FAQ page"
        }
      },
      "unit_scope": {
        "unit": "Power / developer claim",
        "scope": "Ohio",
        "period": "None recorded"
      },
      "supports": "Vantage says the proposed roughly 1,300 MW Fairfield Energy Center would power its adjacent campus without connecting to the local or regional grid. Fairfield Energy says it applied to the Ohio Power Siting Board as Case No. 26-0160-EL-BGN for up to 1,350 MW net gas generation and about 1,040 MW of battery storage, and that construction cannot begin until required approvals and permits are obtained. Those generation figures are not data-center IT capacity. The plans make the relationship clearer, but they still cannot establish future retail-bill effects as an observed outcome, and no post-hearing OPSB order is published.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Institution; Institution"
      },
      "sources": [
        {
          "title": "Vantage Millersport campus FAQ",
          "publisher": "Vantage Data Centers",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-12",
          "url": "https://vantagemillersportcampus.com/faq/",
          "locator": "https://vantagemillersportcampus.com/faq/",
          "supports": "Company prediction that the campus will not affect local electricity costs. Not an observed or regulatory finding."
        },
        {
          "title": "Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN)",
          "publisher": "Fairfield Energy",
          "class": "Institution",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "https://fairfieldenergycenter.com/home/utility-facility",
          "supports": "Developer-reported pending OPSB application. Generation and storage figures are not data-center IT capacity and are not a certificate or construction authorization."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "vantage-oh2-millersport"
      ],
      "href": "/claims/millersport-rate-impact/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:investment",
      "record_id": "meta-lebanon",
      "topic": "investment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $10 billion",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "investment",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "More than $10 billion",
      "unknown": "Completed or placed-in-service capital.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "company and government announcement"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-investment/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:permanent-jobs",
      "record_id": "meta-lebanon",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Approximately 300",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Approximately 300",
      "unknown": "Operating payroll and delivery schedule.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "company and government projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-permanent-jobs/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:construction-jobs",
      "record_id": "meta-lebanon",
      "topic": "construction jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than 4,000 at peak",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "construction jobs",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "More than 4,000 at peak",
      "unknown": "Observed peak, period and job-years.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "company and government projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        },
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-construction-jobs/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:power",
      "record_id": "meta-lebanon",
      "topic": "power",
      "state": "IN",
      "kind": "record-claim",
      "claim": "1 GW designed capacity",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "power",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "1 GW designed capacity",
      "unknown": "Contracted, energized and measured load.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company design claim"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-power/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:city-impact-payment",
      "record_id": "meta-lebanon",
      "topic": "city impact payment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$1.5 million annually per completed phase, up to six phases",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "city impact payment",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "$1.5 million annually per completed phase, up to six phases",
      "unknown": "Executed agreement, phase-completion definition, first due date and receipts.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "government-described term"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-city-impact-payment/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:state-sales-tax-exemption",
      "record_id": "meta-lebanon",
      "topic": "state sales-tax exemption",
      "state": "IN",
      "kind": "record-claim",
      "claim": "35 years, extendable to 50",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "state sales-tax exemption",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "35 years, extendable to 50",
      "unknown": "Controlling agreement and exemptions claimed.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "government-described performance thresholds"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "locator": "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
          "supports": "Phases, jobs, city-payment description and sales-tax exemption thresholds."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-state-sales-tax-exemption/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:cooling-water",
      "record_id": "meta-lebanon",
      "topic": "cooling water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Closed-loop liquid cooling; zero cooling water for most of the year",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "cooling water",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Closed-loop liquid cooling; zero cooling water for most of the year",
      "unknown": "Operating configuration, total site water and measured consumption.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company design claim"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-lebanon:ratepayer-protection",
      "record_id": "meta-lebanon",
      "topic": "ratepayer protection",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Meta says it will pay its full energy and utility costs",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": "2026-02-11",
        "said_where": {
          "title": "Meta",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "ratepayer protection",
        "scope": "Meta Lebanon",
        "period": "None recorded"
      },
      "supports": "Meta says it will pay its full energy and utility costs",
      "unknown": "Utility contract and regulatory cost-allocation record.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company statement only"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Meta",
          "class": "Company",
          "published": "2026-02-11",
          "retrieved": "2026-09-11",
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "locator": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "supports": "Investment, capacity, jobs, cooling, infrastructure, water-restoration and cost-allocation claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "first phase completion or executed agreement publication",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-lebanon"
      ],
      "href": "/claims/meta-lebanon-ratepayer-protection/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:investment",
      "record_id": "aws-new-carlisle",
      "topic": "investment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$11 billion baseline; $13.8 billion later reported",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "investment",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "$11 billion baseline; $13.8 billion later reported",
      "unknown": "Eligible-capital, placed-in-service and geographic scope.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-investment/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:permanent-jobs",
      "record_id": "aws-new-carlisle",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
      "unknown": "Project-specific CF-1, payroll definition, count date, residency and contractor treatment.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company/chamber-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees",
          "to": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
          "reason": "2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.",
          "evidence_url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-permanent-jobs/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:buildout",
      "record_id": "aws-new-carlisle",
      "topic": "buildout",
      "state": "IN",
      "kind": "record-claim",
      "claim": "18 buildings reported vertical",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "buildout",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "18 buildings reported vertical",
      "unknown": "Final campus scope and completion.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-buildout/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:local-property-taxes",
      "record_id": "aws-new-carlisle",
      "topic": "local property taxes",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $1 billion over 35 years",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "local property taxes",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "More than $1 billion over 35 years",
      "unknown": "Annual gross taxes, abatements and net receipts.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        },
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Chamber",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/pages/aws-economic/",
          "locator": "https://www.sbrchamber.com/pages/aws-economic/",
          "supports": "Reported 1,056 full-time AWS employees and other regional metrics."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-local-property-taxes/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:water",
      "record_id": "aws-new-carlisle",
      "topic": "water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Approximately 18 million gallons per year at full buildout",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "water",
        "scope": "AWS New Carlisle",
        "period": "full-buildout projection; undated as to operating year"
      },
      "supports": "AWS-authored/company-linked projection of about 18 million gallons per year at full buildout. Not permitted quantity, current metered use, or an independent delivery finding.",
      "unknown": "Permit quantity, current metered withdrawal/consumption, source-water mix and completion.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company projection"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:community-grants",
      "record_id": "aws-new-carlisle",
      "topic": "community grants",
      "state": "IN",
      "kind": "record-claim",
      "claim": "More than $1.5 million",
      "claimant": {
        "name": "AWS economic-development manager",
        "role": "company",
        "said_on": "2026-07-09",
        "said_where": {
          "title": "South Bend Regional Chamber",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "community grants",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "More than $1.5 million",
      "unknown": "Recipient-level awards and payment records.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "South Bend Regional Chamber",
          "class": "Company",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": "Reported investment, operations staff, buildings, water estimate, infrastructure and community claims."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-community-grants/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:state-incentives",
      "record_id": "aws-new-carlisle",
      "topic": "state incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Up to $98.3 million is the sum of the four listed credit/grant programs and excludes the separately authorized 50-year sales-and-use-tax exemption, whose value is not stated here.",
      "claimant": {
        "name": "Indiana Economic Development Corporation",
        "role": "government",
        "said_on": "2024-04-25",
        "said_where": {
          "title": "Indiana Economic Development Corporation",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "state incentives",
        "scope": "AWS New Carlisle",
        "period": "None recorded"
      },
      "supports": "IEDC's 2024 announcement described a 50-year eligible sales-tax exemption plus up to $98.3 million in listed credits/grants and up to $7 million for roads. Those are package terms, not proof benefits were earned or paid. $98.3 million is not the total incentive-package value because the exemption value is not established here. An IEDC transparency-portal contract split was labeled current as reviewed 2026-09-11 in a review-only portal check with no recorded retrieval, so those contract-status figures are not publication-eligible here.",
      "unknown": "Benefits earned, claimed and received; value of the 50-year sales/use-tax exemption; executed-versus-pending contract statuses on the IEDC portal.",
      "counterevidence": [],
      "verdict": "Not independently verified",
      "confidence": {
        "level": "medium",
        "basis": "government-described performance package"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "2024-04-25",
          "retrieved": "2026-09-11",
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "locator": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "supports": "Baseline investment, jobs, incentives and road contribution."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "annual project-specific CF-1 compliance filing",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-state-incentives/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:expansion-design",
      "record_id": "coreweave-hammond",
      "topic": "expansion design",
      "state": "IN",
      "kind": "record-claim",
      "claim": "450,000 square feet; 180 MW; contemplated 20-year CoreWeave lease",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-10",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "expansion design",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Development agreement expired; expansion not delivered.",
      "unknown": "Exact unsatisfied milestones.",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-approved proposal"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-10",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "locator": "https://www.gohammond.com/hammond-approves-development-agreement-for-new-data-center/",
          "supports": "Approval, proposed building, tenant, power requirement and contingencies."
        },
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-expansion-design/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:permanent-jobs",
      "record_id": "coreweave-hammond",
      "topic": "permanent jobs",
      "state": "IN",
      "kind": "record-claim",
      "claim": "35 to 90 jobs paying more than $75,000",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "permanent jobs",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Not delivered; due status not established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council projection"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-permanent-jobs/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:community-impact-payments",
      "record_id": "coreweave-hammond",
      "topic": "community impact payments",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Up to $4 million per year for 20 years",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "community impact payments",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Not shown due or paid.",
      "unknown": "Executed agreement and payment-trigger clauses.",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council description"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "internal review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-community-impact-payments/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:additional-payment",
      "record_id": "coreweave-hammond",
      "topic": "additional payment",
      "state": "IN",
      "kind": "record-claim",
      "claim": "$25 million lump sum discussed",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-12-22",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10"
        }
      },
      "unit_scope": {
        "unit": "additional payment",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Minutes say it was not yet in the agreement.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "verbal concept in council discussion"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-additional-payment/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:incentives",
      "record_id": "coreweave-hammond",
      "topic": "incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "10-year construction abatement and 20-year 100% technology deduction",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "incentives",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "Claimed or received amounts not established.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Outdated",
      "confidence": {
        "level": "medium",
        "basis": "city-council description"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "internal review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-incentives/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:power-agreement",
      "record_id": "coreweave-hammond",
      "topic": "power agreement",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Final NIPSCO agreement explicitly described as gating",
      "claimant": {
        "name": "City of Hammond",
        "role": "government",
        "said_on": "2025-06-09",
        "said_where": {
          "title": "City of Hammond",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)"
        }
      },
      "unit_scope": {
        "unit": "power agreement",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "No executed agreement located; exact failed milestones undisclosed.",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "city-council record"
      },
      "sources": [
        {
          "title": "Hammond Common Council minutes, 9 June 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-06-09",
          "retrieved": "2026-09-11",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "locator": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "supports": "Proposal, contemplated lease, jobs, tax terms, community payments and explicit power-agreement gating."
        },
        {
          "title": "Hammond Common Council minutes, 22 December 2025",
          "publisher": "City of Hammond",
          "class": "Gov. record",
          "published": "2025-12-22",
          "retrieved": "2026-09-12",
          "url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "locator": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "supports": "Extension, utility negotiations and noncontractual $25 million discussion."
        }
      ],
      "last_checked": "2026-09-12",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 3–11 (resolution 25R-16 introduced p. 3; lease, jobs, tax terms and community impact payment p. 4; NIPSCO contingency p. 6)",
          "reason": "2026-09-11: previously 'pp. 3–4'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/06-09-25_minutes.pdf",
          "by": "internal review"
        },
        {
          "date": "2026-09-11",
          "kind": "locator-changed",
          "from": "Previous locator",
          "to": "pp. 1–4 ($80 million community-payment total p. 1; $25 million announced p. 2; 'Right now it's not part of it' p. 4); extension resolution at p. 10",
          "reason": "2026-09-11: previously 'pp. 1–2; extension resolution at p. 10'.",
          "evidence_url": "https://www.gohammond.com/document_library/meeting_minutes_and_agendas/city_council/2025/12-22-25_minutes.pdf",
          "by": "internal review"
        }
      ],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-power-agreement/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:coreweave-hammond:existing-facility",
      "record_id": "coreweave-hammond",
      "topic": "existing facility",
      "state": "IN",
      "kind": "record-claim",
      "claim": "DX-1 operating; operator publishes 105,000 square feet and up to 20 MW",
      "claimant": {
        "name": "Digital Crossroad",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Digital Crossroad Indiana data center page",
          "url": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "locator": "operator facility page"
        }
      },
      "unit_scope": {
        "unit": "existing facility",
        "scope": "CoreWeave / Digital Crossroads expansion",
        "period": "None recorded"
      },
      "supports": "DX-1 operating; operator publishes 105,000 square feet and up to 20 MW",
      "unknown": "Capacity scope is not classified as critical IT load.",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "operator-reported"
      },
      "sources": [
        {
          "title": "Source",
          "publisher": "Digital Crossroad",
          "class": "Company",
          "published": "current as reviewed 2026-09-10",
          "retrieved": "2026-09-10",
          "url": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "locator": "https://digitalcrossroad.com/data-centers/indiana-data-center/",
          "supports": "Existing facility operation, published area and up-to-20-MW capacity."
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "replacement proposal, new NIPSCO docket or new development agreement",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "coreweave-hammond"
      ],
      "href": "/claims/coreweave-hammond-existing-facility/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:microsoft-quincy:cooling-water",
      "record_id": "microsoft-quincy",
      "topic": "Cooling + water",
      "state": "WA",
      "kind": "record-claim",
      "claim": "Microsoft Quincy: Supported as delivered",
      "claimant": {
        "name": "US EPA case study",
        "role": "government",
        "said_on": "2023",
        "said_where": {
          "title": "US EPA case study",
          "url": "https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "Evaporative cooling with a city-operated, closed-loop blowdown treatment and recirculation system · Recycled cooling water; canal water for make-up; about 5% potable groundwater make-up annually · EPA estimate: 138M gal/year potable-water savings; 260M gal/year canal make-up",
        "scope": "Quincy, Washington",
        "period": "annual"
      },
      "supports": "Government-documented operation. Government-documented mix. Estimated savings + reported flow; not total consumption",
      "unknown": "The EPA observation window is 2021–2022; this is not a new operating audit.",
      "counterevidence": [
        {
          "title": "Microsoft launch account 380 million gallon figure",
          "url": "https://local.microsoft.com/blog/partnering-with-the-city-of-quincy-to-open-washingtons-first-industrial-water-reuse-center/",
          "locator": "company launch story",
          "shows": "A different potable-savings estimate than EPA 138M."
        }
      ],
      "verdict": "Supported",
      "confidence": {
        "level": "high",
        "basis": "government case study"
      },
      "sources": [
        {
          "title": "US EPA case study",
          "publisher": "",
          "class": "Gov. record",
          "published": "2023",
          "retrieved": "2026-09-10",
          "url": "https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington",
          "locator": "https://www.epa.gov/waterreuse/water-reuse-case-study-quincy-washington",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "Recheck current operating status against a later agency or utility record",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "microsoft-quincy"
      ],
      "href": "/claims/microsoft-quincy-cooling-water/",
      "migration_status": "pending_independent_review",
      "as_of": "2021–2022"
    },
    {
      "id": "claim:microsoft-mount-pleasant:cooling-water",
      "record_id": "microsoft-mount-pleasant",
      "topic": "Cooling + water",
      "state": "WI",
      "kind": "record-claim",
      "claim": "Microsoft Mount Pleasant: Announced",
      "claimant": {
        "name": "Microsoft",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Microsoft design disclosure",
          "url": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "Company says site will pilot closed-loop chip-level liquid cooling with no water evaporation for cooling · Initial system fill; other site water uses not quantified in reviewed disclosure · Microsoft identified a 2026 pilot; the same disclosure says new sites begin online in late 2027",
        "scope": "Mount Pleasant, Wisconsin",
        "period": "2026 and late 2027"
      },
      "supports": "Company-announced design. Company design description. Milestones announced; no operating result verified",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Microsoft design disclosure",
          "publisher": "",
          "class": "Company",
          "published": "2024-12-09",
          "retrieved": "2026-09-10",
          "url": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "locator": "https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "microsoft-mount-pleasant"
      ],
      "href": "/claims/microsoft-mount-pleasant-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:google-the-dalles:cooling-water",
      "record_id": "google-the-dalles",
      "topic": "Cooling + water",
      "state": "OR",
      "kind": "record-claim",
      "claim": "Google The Dalles: Mixed evidence",
      "claimant": {
        "name": "Google",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Google project announcement",
          "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "Not established in the reviewed primary source · Site-specific cooling source not established; separate aquifer storage project transferred to city · Google says the city received 100M+ gallons/year of additional stored-water capacity",
        "scope": "The Dalles, Oregon",
        "period": "annual"
      },
      "supports": "Not verifiable. Cooling source not verifiable. Company-reported community capacity; not data-center consumption",
      "unknown": "None recorded",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Google project announcement",
          "publisher": "",
          "class": "Company",
          "published": "2025-10-22",
          "retrieved": "2026-09-10",
          "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "locator": "https://blog.google/company-news/outreach-and-initiatives/sustainability/the-dalles-oregon-water/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "google-the-dalles"
      ],
      "href": "/claims/google-the-dalles-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:aws-new-carlisle:cooling-water",
      "record_id": "aws-new-carlisle",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Source-water mix, permitted quantity, and current metered withdrawal/consumption at AWS New Carlisle.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "water source and metered use",
        "scope": "AWS New Carlisle",
        "period": "current operating period not established"
      },
      "supports": "The reviewed AWS-authored account does not establish source-water mix, a permit quantity, or current metered withdrawal/consumption. The 18-million-gallon figure is a company full-buildout projection tracked on claim:aws-new-carlisle:water.",
      "unknown": "Source water, permitted quantity, current metered withdrawal/consumption, and completion.",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "AWS-authored opinion hosted by the South Bend Regional Chamber"
      },
      "sources": [
        {
          "title": "AWS economic-development account",
          "publisher": "",
          "class": "Chamber",
          "published": "2026-07-09",
          "retrieved": "2026-09-11",
          "url": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "locator": "https://www.sbrchamber.com/news/2026/07/09/default/amazon-s-investment-is-building-lasting-opportunity-for-st.-joseph-county/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "aws-new-carlisle"
      ],
      "href": "/claims/aws-new-carlisle-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:google-fort-wayne:cooling-water",
      "record_id": "google-fort-wayne",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Google Fort Wayne: Not verifiable",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "Not disclosed in the reviewed utility order · Not disclosed in the reviewed utility order · No water metric in the reviewed order; it confirms the site was energized in November 2024",
        "scope": "Fort Wayne, Indiana",
        "period": "none established"
      },
      "supports": "Not verifiable. Not verifiable. Water quantity not verifiable",
      "unknown": "permitted or measured water quantity",
      "counterevidence": [],
      "verdict": "Unknown",
      "confidence": {
        "level": "low",
        "basis": "utility commission final order"
      },
      "sources": [
        {
          "title": "Indiana IURC order 46276",
          "publisher": "",
          "class": "Gov. record",
          "published": "2026-04-29",
          "retrieved": "2026-09-11",
          "url": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
          "locator": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-11",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "google-fort-wayne"
      ],
      "href": "/claims/google-fort-wayne-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:meta-jeffersonville:cooling-water",
      "record_id": "meta-jeffersonville",
      "topic": "Cooling + water",
      "state": "IN",
      "kind": "record-claim",
      "claim": "Meta Jeffersonville: Not verifiable",
      "claimant": {
        "name": "Meta",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Meta project announcement",
          "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "locator": null
        }
      },
      "unit_scope": {
        "unit": "Not established in the reviewed project announcement · Not established in the reviewed project announcement · No permitted or measured water quantity established in the reviewed source",
        "scope": "Jeffersonville, Indiana",
        "period": "none established"
      },
      "supports": "Not verifiable. Not verifiable. Not verifiable",
      "unknown": "permitted or measured water quantity",
      "counterevidence": [],
      "verdict": "Company claim",
      "confidence": {
        "level": "low",
        "basis": "company announcement"
      },
      "sources": [
        {
          "title": "Meta project announcement",
          "publisher": "",
          "class": "Company",
          "published": "2024-01",
          "retrieved": "2026-09-10",
          "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "locator": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "supports": ""
        }
      ],
      "last_checked": "2026-09-10",
      "next_check": {
        "trigger": "None recorded",
        "date": null
      },
      "history": [],
      "entity_ids": [
        "meta-jeffersonville"
      ],
      "href": "/claims/meta-jeffersonville-cooling-water/",
      "migration_status": "pending_independent_review"
    },
    {
      "id": "claim:microsoft-la-porte:incentives",
      "record_id": "microsoft-la-porte",
      "topic": "Incentives",
      "state": "IN",
      "kind": "record-claim",
      "claim": "La Porte Common Council terminated Microsoft's local tax abatement and the state DATA exemption is executed.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "local and state incentive status",
        "scope": "Microsoft La Porte",
        "period": "minutes 2026-03-02; IEDC portal observation 2026-09-11"
      },
      "supports": "The 2 March 2026 council minutes record unanimous adoption of Resolution R-3-2026, whose agenda title describes rescission of the 2024 Microsoft taxpayer agreement, including termination of the tax abatement. DataCenterData has not obtained the adopted resolution text and therefore does not independently state its full legal effect. IEDC showed the state DATA exemption as a pending accepted offer when checked.",
      "unknown": "Adopted resolution text and full legal effect; whether the IEDC DATA offer has been executed.",
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Municipal minutes describe adoption of a titled resolution; controlling signed text was not obtained."
      },
      "sources": [
        {
          "title": "La Porte Common Council minutes, March 2, 2026",
          "publisher": "City of La Porte",
          "class": "Gov. record",
          "published": "2026-03-02",
          "retrieved": "2026-09-11",
          "url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
          "locator": "'Introduction of a Resolution ... Approving the Rescission of a Taxpayer Agreement, Including the Termination of Tax Abatement Authorized Therein' and 'Motion/Vote – Adopt Resolution R-3-2026' ('unanimously carried')",
          "supports": "Minutes record introduction and unanimous adoption of R-3-2026 under that agenda title. They are not the signed resolution text."
        },
        {
          "title": "IEDC Transparency Portal contract record, Microsoft Corporation (Project ID 425481, fund type DATA)",
          "publisher": "Indiana Economic Development Corporation",
          "class": "Gov. record",
          "published": "current as reviewed 2026-09-11",
          "retrieved": "2026-09-11",
          "url": "https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/210ab15f3de5ee11904d001dd8306d4e",
          "locator": "status 'Pending Accepted Offer'; expected qualified investment $2,980,000,000; expected new jobs by contract end 200; no agreement PDF posted",
          "supports": "Portal observation that the state DATA exemption remained a pending accepted offer when checked. Not an executed agreement."
        }
      ],
      "next_check": {
        "trigger": "Obtain the signed text of Resolution R-3-2026 and any executed IEDC DATA agreement",
        "date": null
      },
      "history": [
        {
          "date": "2026-09-11",
          "kind": "correction",
          "from": "35-year state sales-tax exemption for at least $1B eligible capital, with possible extensions; local and NIPSCO incentives referenced but not yet reconciled.",
          "to": "Minutes record unanimous adoption of R-3-2026 under a title describing rescission of the 2024 taxpayer agreement and termination of its tax abatement; adopted resolution text not obtained; IEDC DATA exemption pending.",
          "reason": "Correction chronology uses the recorded date 2026-09-11; the source event date remains 2026-03-02.",
          "evidence_url": "https://www.cityoflaporte.com/uploads/minutes/m_1932_Council-Mar.2-2026-Minutes.docx",
          "by": "internal review"
        }
      ],
      "migration_status": "pending_independent_review",
      "href": "/claims/microsoft-la-porte-incentives/",
      "counterevidence": [],
      "entity_ids": [
        "microsoft-la-porte"
      ],
      "last_checked": "2026-09-11"
    },
    {
      "id": "claim:google-ohio:2025-campus-water",
      "record_id": null,
      "topic": "Water",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Google reported 2025 withdrawal, discharge and consumption figures for its New Albany, Lancaster and Lockbourne campuses.",
      "claimant": {
        "name": "Google",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Google 2026 Environmental Report, p. 97",
          "url": "https://sustainability.google/reports/google-2026-environmental-report/",
          "locator": "p. 97 2025 campus water table"
        }
      },
      "unit_scope": {
        "unit": "million US gallons",
        "scope": "Google-named Ohio campuses",
        "period": "calendar year 2025"
      },
      "supports": "Google's 2026 Environmental Report p.97 publishes company-reported calendar-year 2025 figures, in million US gallons: New Albany withdrawal 1,008.1 / discharge 172.4 / consumption 835.7; Lancaster 307.1 / 171.3 / 135.8; Lockbourne 460.8 / 101.3 / 359.5. These are company-reported campus figures with third-party limited assurance, not city-meter evidence, cooling-only measures, or peak-day rates. Lockbourne is a separate source campus label and is not silently attached to the Columbus campus record.",
      "unknown": "Independent utility/meter corroboration; cooling share; peak-day demand; operators other than Google.",
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Company environmental report; not a municipal meter audit."
      },
      "sources": [
        {
          "title": "Google 2026 Environmental Report landing page",
          "publisher": "Google",
          "class": "Company",
          "published": "2026",
          "retrieved": "2026-09-12",
          "url": "https://sustainability.google/reports/google-2026-environmental-report/",
          "locator": "Google 2026 Environmental Report, p. 97 (2025 campus water table). Landing page opened 2026-09-12; exact p.97 values are the independently extracted 2025 campus figures from that report (million US gallons).",
          "supports": "Company-reported 2025 withdrawal, discharge and consumption by named campus. Google says water is potable unless specified. Third-party limited assurance is not a municipal meter audit."
        }
      ],
      "next_check": {
        "trigger": "Municipal or utility meter records for the named campuses",
        "date": null
      },
      "entity_ids": [
        "google-new-albany-oh",
        "google-lancaster-oh"
      ],
      "related_pages": [
        {
          "title": "Ohio projects",
          "url": "/ohio/#projects"
        }
      ],
      "migration_status": "pending_independent_review",
      "href": "/claims/google-ohio-2025-campus-water/",
      "counterevidence": [],
      "history": [],
      "last_checked": "2026-09-12"
    },
    {
      "id": "ohio-exemption-pause",
      "record_id": null,
      "topic": "Taxes / incentives",
      "state": "OH",
      "kind": "tested-reading",
      "claim": "Ohio's data-center sales-and-use-tax exemption statute has been repealed, or existing agreements were cancelled, by Governor DeWine's pause.",
      "claimant": {
        "name": null,
        "role": "common-reading",
        "said_on": null,
        "said_where": null
      },
      "unit_scope": {
        "unit": "new exemption-request pause",
        "scope": "Ohio",
        "period": "pause announced 2026-05-27; currentness reported 2026-08-06"
      },
      "supports": "ORC §122.175 remains the statute and still sets the $100 million capital / $1.5 million payroll thresholds. The pause applies to new requests and does not repeal the statute or existing agreements. WOSU / Statehouse News Bureau reported on 6 August 2026 that Governor DeWine said the freeze 'will continue until I leave office.'",
      "unknown": "The governor's direct May communication was not independently retrieved. Official Tax Credit Authority text of the pause was not obtained.",
      "verdict": "Partially supported",
      "confidence": {
        "level": "medium",
        "basis": "Statute opened 2026-09-12; currentness attributed to WOSU/Statehouse News Bureau 2026-08-06, also opened 2026-09-12."
      },
      "sources": [
        {
          "title": "Ohio Revised Code §122.175",
          "publisher": "Ohio Legislative Service Commission",
          "class": "Gov. record",
          "published": "2025-09-30",
          "retrieved": "2026-09-12",
          "url": "https://codes.ohio.gov/ohio-revised-code/section-122.175",
          "locator": "§122.175(A)(5) $100 million capital / $1.5 million annual qualifying payroll; (B) complete or partial exemption",
          "supports": "The statute remains in force as the eligibility framework."
        },
        {
          "title": "DeWine: Ohio data center tax break is for next governor to decide on",
          "publisher": "WOSU / Statehouse News Bureau",
          "class": "News",
          "published": "2026-08-06",
          "retrieved": "2026-09-12",
          "url": "https://www.wosu.org/2026-08-06/dewine-ohio-data-center-tax-break-is-for-next-governor-to-decide-on",
          "locator": "paragraphs quoting Gov. Mike DeWine: 'That will continue until I leave office.' Published August 6, 2026.",
          "supports": "Attributed currentness of the new-request pause through the remainder of Governor DeWine's term. Not an independently retrieved governor communication."
        }
      ],
      "next_check": {
        "trigger": "Official Tax Credit Authority or governor record of the pause, or a successor action after DeWine leaves office",
        "date": null
      },
      "migration_status": "pending_independent_review",
      "href": "/claims/ohio-exemption-pause/",
      "counterevidence": [],
      "history": [],
      "entity_ids": [],
      "last_checked": "2026-09-12"
    },
    {
      "id": "claim:vantage-oh1-new-albany:opening",
      "record_id": "vantage-oh1-new-albany",
      "topic": "Opening status",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Vantage OH1's first building opened by December 2025 and is now operating.",
      "claimant": {
        "name": "Vantage Data Centers",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Vantage OH1 New Albany page",
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "locator": "planned three-building campus; December 2025 first-building target"
        }
      },
      "unit_scope": {
        "unit": "opening / operating milestone",
        "scope": "Vantage OH1, three-building campus",
        "period": "projected December 2025; checked 2026-09-11"
      },
      "supports": "The operator page supports a planned three-building campus with 192 MW of planned critical IT load. It still carries a December 2025 first-building target and does not say the building opened. Actual opening is unknown. The passed December 2025 target is stale.",
      "unknown": "Whether any OH1 building has opened or is serving load.",
      "verdict": "Unknown",
      "confidence": {
        "level": "medium",
        "basis": "Operator page retrieved 2026-09-11; no opening confirmation."
      },
      "sources": [
        {
          "title": "Vantage OH1 campus overview",
          "publisher": "Vantage Data Centers",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "locator": "planned three-building campus, 192 MW critical IT load, December 2025 first-building target without opening confirmation",
          "supports": "Planned specifications and a stale opening target. Not current load, grid demand, or an opening confirmation."
        }
      ],
      "next_check": {
        "trigger": "Dated operator or municipal opening confirmation",
        "date": null
      },
      "as_of": "December 2025 target",
      "migration_status": "pending_independent_review",
      "href": "/claims/vantage-oh1-new-albany-opening/",
      "counterevidence": [],
      "history": [],
      "entity_ids": [
        "vantage-oh1-new-albany"
      ],
      "last_checked": "2026-09-11"
    },
    {
      "id": "claim:vantage-oh2-millersport:opsb-status",
      "record_id": "vantage-oh2-millersport",
      "topic": "OPSB / generation status",
      "state": "OH",
      "kind": "record-claim",
      "claim": "Fairfield Energy says it submitted an OPSB application for up to 1,350 MW of net gas generation and approximately 1,040 MW of battery storage.",
      "claimant": {
        "name": "Fairfield Energy",
        "role": "company",
        "said_on": null,
        "said_where": {
          "title": "Fairfield Energy utility-facility page",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "OPSB Case 26-0160-EL-BGN"
        }
      },
      "unit_scope": {
        "unit": "OPSB application status and MW kind",
        "scope": "Fairfield Energy Center adjacent to Vantage OH2",
        "period": "application pending; hearing noticed for 2026-09-17"
      },
      "supports": "Fairfield Energy's page says it submitted OPSB Case 26-0160-EL-BGN for up to 1,350 MW net gas generation plus approximately 1,040 MW of battery storage, and that construction cannot begin until required approvals and permits are obtained. Those are separate generation/storage figures and cannot be summed with Vantage OH2's 696 MW planned critical-IT capacity. The developer page establishes an application, not a certificate or construction authorization; no post-hearing OPSB order was located.",
      "unknown": "Staff report, hearing outcome and any OPSB certificate or construction authorization.",
      "verdict": "Company claim",
      "confidence": {
        "level": "medium",
        "basis": "Developer page; official docket documents were not retrieved."
      },
      "sources": [
        {
          "title": "Fairfield Energy Center major-utility-facility page (OPSB case 26-0160-EL-BGN)",
          "publisher": "Fairfield Energy",
          "class": "Company",
          "published": "",
          "retrieved": "2026-09-11",
          "url": "https://fairfieldenergycenter.com/home/utility-facility",
          "locator": "OPSB Case 26-0160-EL-BGN; up to 1,350 MW net gas plus approximately 1,040 MW battery; construction cannot begin until required approvals",
          "supports": "Developer-reported pending application. Not a certificate, and not data-center IT capacity."
        }
      ],
      "next_check": {
        "trigger": "Official OPSB docket 26-0160-EL-BGN after the 17 September 2026 hearing",
        "date": "2026-09-17"
      },
      "migration_status": "pending_independent_review",
      "href": "/claims/vantage-oh2-millersport-opsb-status/",
      "counterevidence": [],
      "history": [],
      "entity_ids": [
        "vantage-oh2-millersport"
      ],
      "last_checked": "2026-09-11"
    }
  ]
}