  <title>DataCenterData changes</title>
  <id>https://datacenterdata.io/changes/</id>
  <link href="https://datacenterdata.io/changes.xml" rel="self"/>
  <link href="https://datacenterdata.io/changes/"/>
  <updated>2026-09-18T00:00:00Z</updated>
  <author><name>DataCenterData</name><uri>https://datacenterdata.io/about/</uri></author>
  <entry><title>New record · Vantage Data Centers — Quincy Campus · Quincy, WA · publication</title><id>https://datacenterdata.io/changes/#feed-change-042c19171b20c28ca18c</id><link href="https://datacenterdata.io/projects/vantage-quincy-campus-wa/"/><updated>2026-09-18T00:00:00Z</updated><summary>Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.</summary></entry>
  <entry><title>New record · H5 Data Centers — Quincy · Quincy, WA · publication</title><id>https://datacenterdata.io/changes/#feed-change-3900c49e37f84f8adb1a</id><link href="https://datacenterdata.io/facilities/h5-quincy-data-center-wa/"/><updated>2026-09-18T00:00:00Z</updated><summary>Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.</summary></entry>
  <entry><title>New record · CyrusOne — Quincy Data Center · Quincy, WA · publication</title><id>https://datacenterdata.io/changes/#feed-change-a7acd0c579498cc8e54f</id><link href="https://datacenterdata.io/facilities/cyrusone-quincy-data-center-wa/"/><updated>2026-09-18T00:00:00Z</updated><summary>Added after independent re-reading of the state index and site-specific order.</summary></entry>
  <entry><title>Changed source locator · Vantage Data Centers — OH2 Millersport campus · Millersport, OH · OPSB / generation status</title><id>https://datacenterdata.io/changes/#feed-change-229702ffaf591710062a</id><link href="https://datacenterdata.io/claims/vantage-oh2-millersport-opsb-status/"/><updated>2026-09-17T00:00:00Z</updated><summary>The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.</summary></entry>
  <entry><title>Changed source locator · Vantage Data Centers — OH2 Millersport campus · Millersport, OH · Power / developer claim</title><id>https://datacenterdata.io/changes/#feed-change-a3fd655eb84c9aed69ac</id><link href="https://datacenterdata.io/claims/millersport-rate-impact/"/><updated>2026-09-17T00:00:00Z</updated><summary>The historical OPSB summary is described as preserved evidence rather than presented as a working page; the official case-summary URL returns 404 and the Docketing Information System rejected a direct case request during this check.</summary></entry>
  <entry><title>Changed wording · Google The Dalles · The Dalles, OR · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-0c54e7ce294028b6c1f7</id><link href="https://datacenterdata.io/claims/google-the-dalles-cooling-water/"/><updated>2026-09-16T00:00:00Z</updated><summary>A source re-read replaced a generated status label with the exact company claim and separated community storage capacity from data-center water use.</summary></entry>
  <entry><title>Changed wording · Meta — Jeffersonville · Jeffersonville, IN · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-1af97d4bf2a9d87afb90</id><link href="https://datacenterdata.io/claims/meta-jeffersonville-cooling-water/"/><updated>2026-09-16T00:00:00Z</updated><summary>A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.</summary></entry>
  <entry><title>Changed wording · Microsoft Mount Pleasant · Mount Pleasant, WI · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-1f035815ec0761d312a1</id><link href="https://datacenterdata.io/claims/microsoft-mount-pleasant-cooling-water/"/><updated>2026-09-16T00:00:00Z</updated><summary>A source re-read replaced a generated status label with the exact company claim and restored a concise unit boundary.</summary></entry>
  <entry><title>Changed wording · Google — Fort Wayne · Fort Wayne, IN · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-8c550e26eb1e453ef07b</id><link href="https://datacenterdata.io/claims/google-fort-wayne-cooling-water/"/><updated>2026-09-16T00:00:00Z</updated><summary>A source re-read converted a generated status label into the exact inference being tested and restored a concise unit boundary.</summary></entry>
  <entry><title>Changed verdict · Meta — Jeffersonville · Jeffersonville, IN · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-fd865b8928ddea06491e</id><link href="https://datacenterdata.io/claims/meta-jeffersonville-cooling-water/"/><updated>2026-09-16T00:00:00Z</updated><summary>The page tests a common inference about what the announcement establishes; Meta did not make the cooling-and-water statement shown.</summary></entry>
  <entry><title>New record · JP Morgan Chase CDC 1 · Bear, DE · publication</title><id>https://datacenterdata.io/changes/#feed-change-1c6fa55b7c5c757b1799</id><link href="https://datacenterdata.io/facilities/jp-morgan-chase-cdc-1-bear-de/"/><updated>2026-09-14T00:00:00Z</updated><summary>Added as one permit-defined existing facility; current IT use, roles, scale and capacity remain unknown.</summary></entry>
  <entry><title>Changed verdict · Power / rates · OH</title><id>https://datacenterdata.io/changes/#feed-change-1dc68ccdb5d33601288e</id><link href="https://datacenterdata.io/claims/aep-ratepayer-protection/"/><updated>2026-09-14T00:00:00Z</updated><summary>The tariff supports part of the risk-allocation claim, but it does not prove that generation, transmission or wholesale-market costs can never affect household bills.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · city impact payment</title><id>https://datacenterdata.io/changes/#feed-change-24836c6252b44b08adaf</id><link href="https://datacenterdata.io/claims/meta-lebanon-city-impact-payment/"/><updated>2026-09-14T00:00:00Z</updated><summary>The government announcement supports the stated term. It does not establish an executed agreement, a due date or any payment received.</summary></entry>
  <entry><title>New record · Google Papillion Data Center · Papillion, NE · publication</title><id>https://datacenterdata.io/changes/#feed-change-26cb71c9d273d4320720</id><link href="https://datacenterdata.io/projects/google-papillion-data-center-ne/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one operating campus with at least one operating data-center building; complete campus scale, roles, and capacity remain unknown.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · permanent jobs</title><id>https://datacenterdata.io/changes/#feed-change-3ad57a25a1fd659d46c1</id><link href="https://datacenterdata.io/claims/meta-lebanon-permanent-jobs/"/><updated>2026-09-14T00:00:00Z</updated><summary>The figure is a company projection; neither cited announcement is an observed payroll or employment record.</summary></entry>
  <entry><title>Changed verdict · Sabey — Decatur Technology Park · Indianapolis, IN · Power / cost allocation</title><id>https://datacenterdata.io/changes/#feed-change-3c0c72a53f92a81d6ba3</id><link href="https://datacenterdata.io/claims/sabey-cost-allocation-generalized/"/><updated>2026-09-14T00:00:00Z</updated><summary>The cited commitment supports cost allocation for one site, but it cannot establish the statewide generalization shown.</summary></entry>
  <entry><title>Changed verdict · AWS — New Carlisle · New Carlisle, IN · state incentives</title><id>https://datacenterdata.io/changes/#feed-change-433cefb2db86ed37a365</id><link href="https://datacenterdata.io/claims/aws-new-carlisle-state-incentives/"/><updated>2026-09-14T00:00:00Z</updated><summary>The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment.</summary></entry>
  <entry><title>New record · Eternal Mind Loring Data Center Building · Limestone, ME · publication</title><id>https://datacenterdata.io/changes/#feed-change-44f70a66ece81bd6b88e</id><link href="https://datacenterdata.io/facilities/eternal-mind-loring-data-center-me/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.</summary></entry>
  <entry><title>Changed verdict · AWS — New Carlisle · New Carlisle, IN · Project status</title><id>https://datacenterdata.io/changes/#feed-change-60fc92c8918d9b41e532</id><link href="https://datacenterdata.io/claims/aws-campus-complete/"/><updated>2026-09-14T00:00:00Z</updated><summary>This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · investment</title><id>https://datacenterdata.io/changes/#feed-change-6e38530742f89883a9f5</id><link href="https://datacenterdata.io/claims/meta-lebanon-investment/"/><updated>2026-09-14T00:00:00Z</updated><summary>The exact investment figure is a Meta projection. The government announcement repeats it but does not establish completed or placed-in-service capital.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · state sales-tax exemption</title><id>https://datacenterdata.io/changes/#feed-change-7315a8a80d0a0895b1eb</id><link href="https://datacenterdata.io/claims/meta-lebanon-state-sales-tax-exemption/"/><updated>2026-09-14T00:00:00Z</updated><summary>The government announcement supports the stated term. It does not establish the controlling agreement or exemptions actually claimed.</summary></entry>
  <entry><title>New record · Sabey Montana Connections Data Center Project · MT · publication</title><id>https://datacenterdata.io/changes/#feed-change-8cfa46e2d30428a11af3</id><link href="https://datacenterdata.io/projects/sabey-montana-connections-data-center-project-mt/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one proposed land-sale and due-diligence project; no later lifecycle milestone is inferred.</summary></entry>
  <entry><title>New record · Meta Rosemount Data Center · Rosemount, MN · publication</title><id>https://datacenterdata.io/changes/#feed-change-8d611b1a2736f91abc4f</id><link href="https://datacenterdata.io/projects/meta-rosemount-data-center-mn/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one construction-stage campus; roles, capacity, exact parcel, completion, and operation remain unknown.</summary></entry>
  <entry><title>New record · STAK Energy Campus · AK · publication</title><id>https://datacenterdata.io/changes/#feed-change-8df5edfd973f8d4c23b2</id><link href="https://datacenterdata.io/projects/stak-energy-campus-north-slope-ak/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.</summary></entry>
  <entry><title>New record · Massachusetts Green High Performance Computing Center · Holyoke, MA · publication</title><id>https://datacenterdata.io/changes/#feed-change-9c3e14c284303650a265</id><link href="https://datacenterdata.io/facilities/mghpcc-holyoke-ma/"/><updated>2026-09-14T00:00:00Z</updated><summary>Added as one assessed building with dated operating evidence; current utilization and capacity remain unknown.</summary></entry>
  <entry><title>New record · DRFortress · Honolulu, HI · publication</title><id>https://datacenterdata.io/changes/#feed-change-bac153787496e9e305af</id><link href="https://datacenterdata.io/facilities/drfortress-honolulu-hi/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified from current ETS use and procurement pages as one operating facility; roles, capacity, and scale remain unknown.</summary></entry>
  <entry><title>New record · Gotspace Groton Data Center Project · Groton, CT · publication</title><id>https://datacenterdata.io/changes/#feed-change-c3ad34bb7c0db242893b</id><link href="https://datacenterdata.io/projects/gotspace-groton-data-center-project-ct/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified as one agreement-backed project with current lifecycle unknown; all later milestones remain unverified.</summary></entry>
  <entry><title>New record · Gemini Addition · Sioux Falls, SD · publication</title><id>https://datacenterdata.io/changes/#feed-change-d096f94341c717e1a22b</id><link href="https://datacenterdata.io/projects/gemini-addition-data-center-sioux-falls-sd/"/><updated>2026-09-14T00:00:00Z</updated><summary>Added as one rezoning and preliminary-plan-approved project; construction, end user, roles and capacity remain unknown.</summary></entry>
  <entry><title>Changed verdict · Microsoft — La Porte · La Porte, IN · Jobs / timing</title><id>https://datacenterdata.io/changes/#feed-change-eb63465aff65aa3565da</id><link href="https://datacenterdata.io/claims/microsoft-laporte-jobs-now/"/><updated>2026-09-14T00:00:00Z</updated><summary>The claim says the projected jobs already exist, while the cited company source still describes a forecast and the government source describes a different job scope.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · construction jobs</title><id>https://datacenterdata.io/changes/#feed-change-eb8d3fc4f667a5a58d0a</id><link href="https://datacenterdata.io/claims/meta-lebanon-construction-jobs/"/><updated>2026-09-14T00:00:00Z</updated><summary>The peak construction-jobs figure is a company projection, not an observed workforce count or job-years measure.</summary></entry>
  <entry><title>New record · DataOne Vineland AI Data Center · Vineland, NJ · publication</title><id>https://datacenterdata.io/changes/#feed-change-f14766f491baae1f416a</id><link href="https://datacenterdata.io/projects/dataone-vineland-ai-data-center-nj/"/><updated>2026-09-14T00:00:00Z</updated><summary>Qualified at approval only; current construction and applicant corporate-role crosswalk remain unresolved.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · Water / cooling</title><id>https://datacenterdata.io/changes/#feed-change-fddc9fd242c755d738cd</id><link href="https://datacenterdata.io/claims/meta-closed-loop-zero-water/"/><updated>2026-09-14T00:00:00Z</updated><summary>The prior label is defined for an unverified statement by a non-company party. This card tests a common inference instead; the reviewed company source does not establish annual or total campus water use.</summary></entry>
  <entry><title>New record · Thornburg Industrial Park 2 · VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-0623e1d009a162fbc63e</id><link href="https://datacenterdata.io/projects/thornburg-industrial-park-2/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary></entry>
  <entry><title>New record · Gilroy Data Center · Gilroy, CA · publication</title><id>https://datacenterdata.io/changes/#feed-change-11275b85bffdb5e03d3f</id><link href="https://datacenterdata.io/projects/gilroy-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded construction-stage project after independent review of the City of Gilroy source.</summary></entry>
  <entry><title>New record · Microsoft Tyrone Data Center Project · Tyrone, GA · publication</title><id>https://datacenterdata.io/changes/#feed-change-1c9e057b8aa67c3e4a2b</id><link href="https://datacenterdata.io/projects/microsoft-tyrone-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a zoning-approved project after a fresh review of the Town of Tyrone source; unverified Project Rita, building and capacity details were excluded.</summary></entry>
  <entry><title>New record · Meta Gallatin Data Center · Gallatin, TN · publication</title><id>https://datacenterdata.io/changes/#feed-change-1df404aec87e83109dd6</id><link href="https://datacenterdata.io/projects/meta-gallatin-tn/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one campus record; operating status remains visibly operator-attributed and regional renewable-generation figures were excluded from campus capacity.</summary></entry>
  <entry><title>New record · Nexus Data Center Hubbard · Hubbard, TX · publication</title><id>https://datacenterdata.io/changes/#feed-change-2a9b0ed3fec41a3c8efd</id><link href="https://datacenterdata.io/projects/nexus-data-center-hubbard/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a permit-defined proposed project after independent review of current TCEQ records.</summary></entry>
  <entry><title>New record · Rifle Range Road Data Center Project · MO · publication</title><id>https://datacenterdata.io/changes/#feed-change-3342d2e73c7612176acb</id><link href="https://datacenterdata.io/projects/rifle-range-road-data-center-mo/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one dated construction-stage project; party identities, current progress, capacity and physical scale remain unknown.</summary></entry>
  <entry><title>New record · QTS York County Data Center Campus · SC · publication</title><id>https://datacenterdata.io/changes/#feed-change-340ee51aab4790f472a0</id><link href="https://datacenterdata.io/projects/qts-york-county-campus/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage campus after a fresh review of county and state records; planned/developing buildings were not counted as operating facilities.</summary></entry>
  <entry><title>New record · ADC Plano · Plano, TX · publication</title><id>https://datacenterdata.io/changes/#feed-change-3efd01970081a83ec230</id><link href="https://datacenterdata.io/facilities/adc-plano/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded operating-facility record after independent review of current TCEQ records.</summary></entry>
  <entry><title>New record · Polaris Forge 2 · ND · publication</title><id>https://datacenterdata.io/changes/#feed-change-45dd01847b4ce90a5121</id><link href="https://datacenterdata.io/projects/applied-digital-polaris-forge-2-harwood-nd/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage campus; the lease-backed 200 MW was scoped to the initial two-building phase and developer, operator, owner and tenant identities remain unresolved.</summary></entry>
  <entry><title>New record · Pairmont Data Center Campus · VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-4af301987bf0978b5e99</id><link href="https://datacenterdata.io/projects/pairmont-data-center-campus/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary></entry>
  <entry><title>New record · Amazon Data Services BWI-150–BWI-153 Campus · MD · publication</title><id>https://datacenterdata.io/changes/#feed-change-5fa2a4be227b15df3b05</id><link href="https://datacenterdata.io/projects/amazon-bwi150-frederick-campus/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one permit-approved campus after a fresh review of the issued permit and MDE pages; generator ratings and broader-site relationships were not promoted.</summary></entry>
  <entry><title>New record · Osmium Data Center · West Des Moines, IA · publication</title><id>https://datacenterdata.io/changes/#feed-change-70548bb08454f43a1b84</id><link href="https://datacenterdata.io/facilities/osmium-data-center-west-des-moines/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one permit-defined existing facility; party roles, physical scale and data-center capacity remain unknown.</summary></entry>
  <entry><title>New record · AL Bessemer Land Data Center Project · Bessemer, AL · publication</title><id>https://datacenterdata.io/changes/#feed-change-73f2e9d136e1ee57c6be</id><link href="https://datacenterdata.io/projects/al-bessemer-land-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one zoning-approved project; company identity, construction, acreage and capacity claims remain excluded.</summary></entry>
  <entry><title>New record · Cumulus Group LLC Buffalo Data Center · Buffalo, WV · publication</title><id>https://datacenterdata.io/changes/#feed-change-777ef22bf85ba462e741</id><link href="https://datacenterdata.io/projects/cumulus-buffalo-data-center-wv/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one proposed project from the live application and pending register; generator ratings and a possible Google relationship were not promoted.</summary></entry>
  <entry><title>New record · Paducah Site AI/HPC Innovation Campus · KY · publication</title><id>https://datacenterdata.io/changes/#feed-change-7d27403119476d579d6c</id><link href="https://datacenterdata.io/projects/brookfield-paducah-site-ai-campus-ky/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.</summary></entry>
  <entry><title>New record · Project Cardinal Data Center Campus · Yorkville, IL · publication</title><id>https://datacenterdata.io/changes/#feed-change-86b46d085530510086af</id><link href="https://datacenterdata.io/projects/project-cardinal-yorkville/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added with approved status bounded to the annexation agreement after independent review of Yorkville&apos;s project dockets.</summary></entry>
  <entry><title>New record · Beale Data Center · De Soto, KS · publication</title><id>https://datacenterdata.io/changes/#feed-change-99af5d68248ba79550c1</id><link href="https://datacenterdata.io/projects/beale-project-pilot-de-soto-ks/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage campus after separate review of current City pages; planned buildings were kept out of operating-facility counts and operator identity remains unknown.</summary></entry>
  <entry><title>New record · Global AI (Colorado), LLC Data Center Project · CO · publication</title><id>https://datacenterdata.io/changes/#feed-change-9a38466d5a4ba2cb498f</id><link href="https://datacenterdata.io/projects/global-ai-weld-county-co/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one land-use-approved reuse project; construction, operation, capacity and operator remain unproven.</summary></entry>
  <entry><title>New record · Project Bedrock · Nampa, ID · publication</title><id>https://datacenterdata.io/changes/#feed-change-9a4ccd145194f83c5d91</id><link href="https://datacenterdata.io/facilities/project-bedrock-nampa-id/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one approved building after separate review of City permit and planning records; non-official capacity and construction claims were excluded.</summary></entry>
  <entry><title>New record · Mineral Gap Data Center · Wise, VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-9f5b577e42e65281454f</id><link href="https://datacenterdata.io/facilities/mineral-gap-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded operating-facility record after independent review of the cited Wise County source.</summary></entry>
  <entry><title>New record · Solis Arx / Fluidstack Progress Park Project · VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-a187fb1acbd319bb8e2d</id><link href="https://datacenterdata.io/projects/solis-arx-fluidstack-progress-park/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded proposed-stage project after independent review of the cited Wythe County record.</summary></entry>
  <entry><title>New record · Apple Maiden Data Center Campus · Maiden, NC · publication</title><id>https://datacenterdata.io/changes/#feed-change-a4a6f9073edfef6326a0</id><link href="https://datacenterdata.io/projects/apple-maiden-nc/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one operating campus at Maiden/Catawba precision after separate review of the County statement; directory address, date, capacity and scale details were excluded.</summary></entry>
  <entry><title>New record · EdgeCore Shannon Hill Data Center Project · VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-ac20e5c967db835dbbe8</id><link href="https://datacenterdata.io/projects/edgecore-shannon-hill/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded proposed-stage project after independent review of the cited Louisa County record.</summary></entry>
  <entry><title>New record · HostDime AI/Data Center · Eatonville, FL · publication</title><id>https://datacenterdata.io/changes/#feed-change-b197a086aff80f8cd958</id><link href="https://datacenterdata.io/facilities/hostdime-eatonville-fl/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage building after fresh review of the municipal packet and meeting page; directory naming, capacity and opening claims were excluded.</summary></entry>
  <entry><title>New record · Project Baccara · AZ · publication</title><id>https://datacenterdata.io/changes/#feed-change-b4e3fbccc4be605322a5</id><link href="https://datacenterdata.io/projects/project-baccara/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a proposed data-center project after a second review of the Commission source; the separate generation-certificate approval is preserved without promoting the project lifecycle.</summary></entry>
  <entry><title>New record · Google West Memphis Campus · West Memphis, AR · publication</title><id>https://datacenterdata.io/changes/#feed-change-c491d4e20090d6e3b4ca</id><link href="https://datacenterdata.io/projects/google-west-memphis-campus/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage campus after fresh review of state, utility-commission and utility sources; unverified building, parcel and capacity details were excluded.</summary></entry>
  <entry><title>New record · Meta Tulsa Data Center · Tulsa, OK · publication</title><id>https://datacenterdata.io/changes/#feed-change-ced445f7dc51fa623c52</id><link href="https://datacenterdata.io/projects/meta-tulsa-ok/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage project; grid-energy capacity and industrial-park acreage were excluded from the data-center record.</summary></entry>
  <entry><title>New record · STREAM U.S. Data Centers at STAMP (Project Double Reed) · Alabama, NY · publication</title><id>https://datacenterdata.io/changes/#feed-change-d2e25756cf8fe5f97a69</id><link href="https://datacenterdata.io/projects/stream-stamp-alabama-ny/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one proposed project after fresh review of current GCEDC materials; the rescinded 2025 configuration was not counted separately and 500 MW was typed only as an applicant estimate.</summary></entry>
  <entry><title>New record · Amazon Vicksburg Project · Vicksburg, MS · publication</title><id>https://datacenterdata.io/changes/#feed-change-dc0808b0cecdc47b3a3c</id><link href="https://datacenterdata.io/projects/amazon-vicksburg-project-ms/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one state-announced proposed project; site, county, roles, approvals and capacity remain unknown.</summary></entry>
  <entry><title>New record · Goodnight Data Center · Claude, TX · publication</title><id>https://datacenterdata.io/changes/#feed-change-df1aa35646cd7c6734ff</id><link href="https://datacenterdata.io/projects/goodnight-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a permit-defined proposed project after independent review of current TCEQ records.</summary></entry>
  <entry><title>New record · Related Digital Cheyenne Data Center Campus · Cheyenne, WY · publication</title><id>https://datacenterdata.io/changes/#feed-change-ea6610fbc3c25ad34f28</id><link href="https://datacenterdata.io/projects/related-digital-cheyenne-wy/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one construction-stage campus; the 302 MW and first-facility figures remain explicitly planned rather than current or operating.</summary></entry>
  <entry><title>New record · Apple Reno Data Center · Sparks, NV · publication</title><id>https://datacenterdata.io/changes/#feed-change-ed6e5bbe1e27705c53f7</id><link href="https://datacenterdata.io/projects/apple-reno-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded operating-campus record after a second review of the Nevada GOED minutes and application packet.</summary></entry>
  <entry><title>New record · Amazon Falls Township Data Center Project · Falls Township, PA · publication</title><id>https://datacenterdata.io/changes/#feed-change-fb7c9f579cd32c6fbc49</id><link href="https://datacenterdata.io/projects/amazon-falls-township-data-center/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as one land-development-approved project; construction, operating roles and capacity remain unproven.</summary></entry>
  <entry><title>New record · Massaponax Tech Campus · VA · publication</title><id>https://datacenterdata.io/changes/#feed-change-fce979b406fe3b9df27a</id><link href="https://datacenterdata.io/projects/massaponax-tech-campus/"/><updated>2026-09-13T00:00:00Z</updated><summary>Added as a bounded under-review project after independent review of Spotsylvania County case records.</summary></entry>
  <entry><title>Changed verdict · AWS — New Carlisle · New Carlisle, IN · Project status</title><id>https://datacenterdata.io/changes/#feed-change-01a8b01daf6f809e60dc</id><link href="https://datacenterdata.io/claims/aws-campus-complete/"/><updated>2026-09-12T00:00:00Z</updated><summary>The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.</summary></entry>
  <entry><title>Changed source locator · Vantage Data Centers — OH2 Millersport campus · Millersport, OH · Power / developer claim</title><id>https://datacenterdata.io/changes/#feed-change-04ba170b42eafac3c180</id><link href="https://datacenterdata.io/claims/millersport-rate-impact/"/><updated>2026-09-12T00:00:00Z</updated><summary>Primary-record follow-up confirmed the proposal and hearing date while preserving the unresolved MW discrepancy and outcome hold.</summary></entry>
  <entry><title>Changed verdict · Taxes / incentives · OH</title><id>https://datacenterdata.io/changes/#feed-change-071628bae1001b5d169f</id><link href="https://datacenterdata.io/claims/ohio-exemption-pause/"/><updated>2026-09-12T00:00:00Z</updated><summary>The reviewed statute remains in force, and the reported pause concerns new requests rather than repeal or cancellation of existing agreements.</summary></entry>
  <entry><title>Changed source locator · Water / permits · OH</title><id>https://datacenterdata.io/changes/#feed-change-0fed43b408ebf5cb7df8</id><link href="https://datacenterdata.io/claims/ohio-water-permit/"/><updated>2026-09-12T00:00:00Z</updated><summary>Primary-record follow-up recovered the agency&apos;s own notice, and the second review re-read it; a later live recheck was unavailable and is not treated as a retraction.</summary></entry>
  <entry><title>Changed source locator · Google · OH · Water</title><id>https://datacenterdata.io/changes/#feed-change-25a5d7e4250b018325c7</id><link href="https://datacenterdata.io/claims/google-ohio-2025-campus-water/"/><updated>2026-09-12T00:00:00Z</updated><summary>Independent re-extraction confirmed the three Google-reported Ohio rows without turning company reporting into municipal measurement.</summary></entry>
  <entry><title>Changed source locator · AWS — New Carlisle · New Carlisle, IN · state incentives</title><id>https://datacenterdata.io/changes/#feed-change-2c5ed2fc1aa96c753369</id><link href="https://datacenterdata.io/claims/aws-new-carlisle-state-incentives/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes.</summary></entry>
  <entry><title>Changed field · AWS — New Carlisle · New Carlisle, IN · incentives_commitments</title><id>https://datacenterdata.io/changes/#feed-change-39fc8c5ee659f82f3b14</id><link href="https://datacenterdata.io/indiana/#record-aws-new-carlisle"/><updated>2026-09-12T00:00:00Z</updated><summary>IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.</summary></entry>
  <entry><title>Changed verdict · Taxes / incentives · OH</title><id>https://datacenterdata.io/changes/#feed-change-4bb0b36a27df6a412a5a</id><link href="https://datacenterdata.io/claims/ohio-data-centers-no-taxes/"/><updated>2026-09-12T00:00:00Z</updated><summary>The statute authorizes a complete or partial equipment sales-and-use-tax exemption; it does not establish that a qualifying project pays no taxes.</summary></entry>
  <entry><title>New record · QTS Eagle Mountain Campus · Eagle Mountain, UT · publication</title><id>https://datacenterdata.io/changes/#feed-change-5ad33d915448c21fe4d3</id><link href="https://datacenterdata.io/projects/qts-eagle-mountain-campus/"/><updated>2026-09-12T00:00:00Z</updated><summary>Added as a bounded construction-stage campus record after a second review of the cited Eagle Mountain City sources.</summary></entry>
  <entry><title>Changed verdict · Meta — Lebanon · Lebanon, IN · Water / cooling</title><id>https://datacenterdata.io/changes/#feed-change-6dcfa40392d245554a27</id><link href="https://datacenterdata.io/claims/meta-closed-loop-zero-water/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review found that a literal zero-water conclusion is not established by Meta&apos;s narrower future design statement.</summary></entry>
  <entry><title>Changed wording · Microsoft Quincy · Quincy, WA · Cooling + water</title><id>https://datacenterdata.io/changes/#feed-change-6e2b3c56853a84813211</id><link href="https://datacenterdata.io/claims/microsoft-quincy-cooling-water/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year.</summary></entry>
  <entry><title>Changed field · Vantage Data Centers — OH1 campus · New Albany, OH · Opening status</title><id>https://datacenterdata.io/changes/#feed-change-806a7d7e5c2cc3137a6d</id><link href="https://datacenterdata.io/claims/vantage-oh1-new-albany-opening/"/><updated>2026-09-12T00:00:00Z</updated><summary>The operator page states a forecast and does not claim that the first building opened or is operating.</summary></entry>
  <entry><title>Changed field · EdgeConneX — New Albany location · New Albany, OH · lifecycle_status</title><id>https://datacenterdata.io/changes/#feed-change-8123df1c3daa7d5aea25</id><link href="https://datacenterdata.io/ohio/#record-edgeconnex-new-albany-oh"/><updated>2026-09-12T00:00:00Z</updated><summary>Corrected operating to construction. The prior basis itself said operation was not established; city records support an active building project and groundbreaking, not operation.</summary></entry>
  <entry><title>Changed wording · Taxes / jobs · OH</title><id>https://datacenterdata.io/changes/#feed-change-93fe05935b077f0caebe</id><link href="https://datacenterdata.io/claims/new-albany-payroll-equivalent/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review narrowed the place, taxpayer and time scope and made the missing underlying records explicit.</summary></entry>
  <entry><title>New record · Vantage Lighthouse Campus · Port Washington, WI · publication</title><id>https://datacenterdata.io/changes/#feed-change-a2065cdcd3eafac9a120</id><link href="https://datacenterdata.io/projects/vantage-lighthouse-port-washington/"/><updated>2026-09-12T00:00:00Z</updated><summary>Added as a bounded construction-stage campus record after a second review of the cited Wisconsin DNR sources.</summary></entry>
  <entry><title>Changed field · Sabey — Decatur Technology Park · Indianapolis, IN · lifecycle_status</title><id>https://datacenterdata.io/changes/#feed-change-b1957c3965fbde0d609b</id><link href="https://datacenterdata.io/indiana/#record-sabey-indianapolis"/><updated>2026-09-12T00:00:00Z</updated><summary>Changed from construction to approved. The commission record establishes approval subject to commitments, but no reviewed primary source establishes that construction began.</summary></entry>
  <entry><title>Changed wording · Ohio Consumers&apos; Counsel · OH · Statewide count</title><id>https://datacenterdata.io/changes/#feed-change-c99ac7fd5c69ad3d8c08</id><link href="https://datacenterdata.io/claims/ohio-count-200/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review removed an unsupported description of the directory denominator and distinguished URL-path timing from publication date.</summary></entry>
  <entry><title>Changed verdict · Sabey — Decatur Technology Park · Indianapolis, IN · Power / cost allocation</title><id>https://datacenterdata.io/changes/#feed-change-dbb676bf19cd4fd68ef3</id><link href="https://datacenterdata.io/claims/sabey-cost-allocation-generalized/"/><updated>2026-09-12T00:00:00Z</updated><summary>One site&apos;s cost commitment cannot establish the statewide claim shown.</summary></entry>
  <entry><title>Changed source locator · Vantage Data Centers — OH2 Millersport campus · Millersport, OH · OPSB / generation status</title><id>https://datacenterdata.io/changes/#feed-change-f1f2857351ef245b667c</id><link href="https://datacenterdata.io/claims/vantage-oh2-millersport-opsb-status/"/><updated>2026-09-12T00:00:00Z</updated><summary>The official and company summaries disagree; neither is converted to data-center IT capacity and the underlying filing remains unavailable.</summary></entry>
  <entry><title>Changed verdict · Microsoft — La Porte · La Porte, IN · Jobs / timing</title><id>https://datacenterdata.io/changes/#feed-change-f52f0cfdd8c3ac627547</id><link href="https://datacenterdata.io/claims/microsoft-laporte-jobs-now/"/><updated>2026-09-12T00:00:00Z</updated><summary>The 600-plus first-phase forecast has no retrieved due date; the 2032 date belongs to a different 200-job scope.</summary></entry>
  <entry><title>Changed verdict · Power / rates · OH</title><id>https://datacenterdata.io/changes/#feed-change-fa5e9cbc08ce480d613a</id><link href="https://datacenterdata.io/claims/aep-ratepayer-protection/"/><updated>2026-09-12T00:00:00Z</updated><summary>The second review found that the tariff supports risk allocation but not the absolute household-bill conclusion, and PUCO&apos;s own description is not limited to distribution.</summary></entry>
  <entry><title>Changed field · Power / rates · OH</title><id>https://datacenterdata.io/changes/#feed-change-05524386df025f4b1bcf</id><link href="https://datacenterdata.io/claims/aep-ratepayer-protection/"/><updated>2026-09-11T00:00:00Z</updated><summary>Added how the 85% minimum-demand term works by contract size and AEP&apos;s count of pre-tariff contracted load. Verdict unchanged. The 72.5% and 82.5% shares are DataCenterData arithmetic from AEP&apos;s published formula (15,000 kW plus 85% above 25,000 kW up to 75,000 kW; 57,500 kW plus 100% above 75,000 kW; capped at 85% of contract capacity).</summary></entry>
  <entry><title>Changed field · AWS — New Carlisle · New Carlisle, IN · permanent jobs</title><id>https://datacenterdata.io/changes/#feed-change-176bc62659d59a64aa80</id><link href="https://datacenterdata.io/claims/aws-new-carlisle-permanent-jobs/"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: status was &apos;supported-as-delivered&apos; with value &apos;At least 1,000 baseline; 1,056 full-time AWS employees later reported&apos;. The company-linked counts sit on either side of the baseline (AWS op-ed: &apos;We have also hired nearly 1,000 operations staff so far&apos;; Chamber page: &apos;1,056 full-time AWS employees&apos;, undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.</summary></entry>
  <entry><title>Changed field · Google — New Albany campus · New Albany, OH · county</title><id>https://datacenterdata.io/changes/#feed-change-19781c4c6cb90a4c07b5</id><link href="https://datacenterdata.io/ohio/#record-google-new-albany-oh"/><updated>2026-09-11T00:00:00Z</updated><summary>County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.</summary></entry>
  <entry><title>Changed field · Water / permits · OH</title><id>https://datacenterdata.io/changes/#feed-change-265670158917605fa4df</id><link href="https://datacenterdata.io/claims/ohio-water-permit/"/><updated>2026-09-11T00:00:00Z</updated><summary>Correction chronology uses the recorded date, not the 21 July agency-event date.</summary></entry>
  <entry><title>Changed field · Microsoft — La Porte · La Porte, IN · Incentives</title><id>https://datacenterdata.io/changes/#feed-change-2a1ecc7fbca62cde89f8</id><link href="https://datacenterdata.io/claims/microsoft-la-porte-incentives/"/><updated>2026-09-11T00:00:00Z</updated><summary>Correction chronology uses the recorded date 2026-09-11; the source event date remains 2026-03-02.</summary></entry>
  <entry><title>Changed field · Meta — New Albany campus / Prometheus expansion · New Albany, OH · county</title><id>https://datacenterdata.io/changes/#feed-change-34e696b3ede4555ec63c</id><link href="https://datacenterdata.io/ohio/#record-meta-new-albany-oh"/><updated>2026-09-11T00:00:00Z</updated><summary>County resolved from Licking County parcel records. County is a typed field and may not hold a sentence.</summary></entry>
  <entry><title>Changed source locator · CoreWeave / Digital Crossroads expansion · Hammond, IN · additional payment</title><id>https://datacenterdata.io/changes/#feed-change-3659344022f7a20e086e</id><link href="https://datacenterdata.io/claims/coreweave-hammond-additional-payment/"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: previously &apos;pp. 1–2; extension resolution at p. 10&apos;.</summary></entry>
  <entry><title>Changed field · Google — Fort Wayne · Fort Wayne, IN · record</title><id>https://datacenterdata.io/changes/#feed-change-3b3203c9b6fcdfdd13f3</id><link href="https://datacenterdata.io/indiana/#record-google-fort-wayne"/><updated>2026-09-11T00:00:00Z</updated><summary>previously &apos;35-year state sales-tax exemption for at least $800M eligible capital, with extensions tied to additional eligible investment up to 50 years.&apos; The $800M figure is the announcement&apos;s wording; the executed agreement (Exhibit A, section 2.A, page 13 of 18) says $845,000,000. The IEDC portal&apos;s separate &apos;expected qualified investment&apos; field ($830M) is a different field and is not used here.</summary></entry>
  <entry><title>Changed field · DataBank — CLE1 · Cleveland, OH · facility location</title><id>https://datacenterdata.io/changes/#feed-change-5f4f050032fe2c08969e</id><link href="https://datacenterdata.io/ohio/#record-databank-cle1"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: suite and ZIP added from the cited DataBank page (&apos;1255 Euclid Ave Suite #200 - Cleveland, OH 44115&apos;); CLE1 is a suite in a multi-tenant building, so the building should be counted once if other providers there are added.</summary></entry>
  <entry><title>Changed field · Microsoft — La Porte · La Porte, IN · record</title><id>https://datacenterdata.io/changes/#feed-change-6077c68dc6f89b491cb4</id><link href="https://datacenterdata.io/indiana/#record-microsoft-la-porte"/><updated>2026-09-11T00:00:00Z</updated><summary>The Common Council minutes record &apos;Motion/Vote – Adopt Resolution R-3-2026&apos; and say the motion was unanimously carried. The LEAP director states that the resolution refers to the taxpayer agreement approved in 2024 with Microsoft.</summary></entry>
  <entry><title>Changed field · indianapolis_appendix</title><id>https://datacenterdata.io/changes/#feed-change-7eff65ee3022c3655717</id><link href="https://datacenterdata.io/indiana/"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: publisher was &apos;Indianapolis Metropolitan Development Commission filing&apos; and kind &apos;municipal case record containing an existing Indianapolis facility list&apos;.</summary></entry>
  <entry><title>Changed source locator · CoreWeave / Digital Crossroads expansion · Hammond, IN · incentives</title><id>https://datacenterdata.io/changes/#feed-change-8301c185d4c6c47912d9</id><link href="https://datacenterdata.io/claims/coreweave-hammond-incentives/"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: previously &apos;pp. 3–4&apos;.</summary></entry>
  <entry><title>Changed field · QTS Data Centers — Van Wert campus · Van Wert, OH · jobs</title><id>https://datacenterdata.io/changes/#feed-change-9322c5657a16c600fca0</id><link href="https://datacenterdata.io/ohio/#record-qts-van-wert-oh"/><updated>2026-09-11T00:00:00Z</updated><summary>2026-09-11: previously &apos;Thousands of construction jobs and hundreds of full-time positions; company projection&apos;. Quantified figures are from the FAQ answer &apos;How many jobs will this project create?&apos; on https://q.com/data-centers/van-wert/.</summary></entry>